Large residential · Co. Carlow

Gort Na Gréine, Ballinabrannagh, Co. Carlow

Granted 24 Jul 2026

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2660031 at Gort na Gréine, Ballinabrannagh, Co. Carlow: 31 homes.
  • The applicant is Cieval Ltd. The agent is Mark Bannon.
  • It was received by Carlow County Council on 10 Feb 2026.
  • Status: Granted 24 Jul 2026.
  • Work was due to start on 14 Oct 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Carlow County Council planning register, checked 12 Aug 2026. Open the council's file

More planning applications in Ballinabrannagh · Planning applications in Co. Carlow

What and where

31 homes

the completion of an unfinished estate at Gort Na Gréine, Ballinabrannagh. The completion of the development includes the construction of 8 No. semi-detached 3 bedroom two storey dwellings at sites 46-53 plus 1 No. two storey detached 3 bedroom dwelling at site 42. Also included is the construction of 22 No. two storey dwellings (type A – 5 No. two storey 4 bedroom detached dwellings, types A1/A2 – 3 No. two storey 5 bedroom detached dwellings, type B – 2 No. two storey 4 bedroom semi detached dwellings and type C – 12 No. two storey 3 bedroom semi detached dwellings), plus all landscaping, provision of recreation area / public open space and all associated overground and underground site works including an on site waste water treatment system. Sites 1-22 to be accessed via an existing site access and road network

Description as published by the council. Its text starts part-way through a sentence.

Location
Ballinabrannagh, Co. Carlow Map
Planning reference
2660031
Applicant
Cieval Ltd

Numbers and dates

Homes
31
Floor area
4,425 m²per planning documents
Estimated construction value
€6.3m to €8.0mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Project type
Large residential
Received
10 Feb 2026
Granted
24 Jul 2026
Site start notified
14 Oct 2026

Timeline

  1. Application received
  2. Granted
  3. Site start notified

Outlook

What happens next

Work was due to start on 14 Oct 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Roads and site development worksNamed in the application description
  • LandscapingNamed in the planning documents
  • GroundworksNamed in the planning documents
  • WastewaterNamed in the planning documents

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660031 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from Application Form - Part A in the council's file.
    Unit mix
    21 3 Bed, 7 4 Bed, 3 4+ Bed
    Floor area
    4,425 m² (per planning documents)
    Site area
    2.088 ha
    Applicant in the planning documents
    Cieval Limited
    Scope
    Completion of unfinished estate including 31 dwellings, landscaping, recreation area, and on-site wastewater treatment system.
    Landscaping
    “all landscaping, provision of recreation area / public open space”
    Groundworks
    “all associated overground and underground site works”
    Wastewater
    “on site waste water treatment system”

Reviewed build intelligence

What the documents establish

Government document review

A final grant covers this 31-home completion package. Existing homes and the drawing’s reserved future phase remain separate. Wastewater connection and revised drainage conditions still require compliance; permission is not proof of works commencing.

2 official documents inspected · Checked 2026-09-07 · Official file index

Final grant covers 31 homes within an unfinished estate

Final permission for the current completion package; existing and reserved future phases are separate

What the evidence says
The final-grant notification, signed 27 August after the 26 August order, covers eight semi-detached houses, one detached house and 22 further houses. Condition 1 incorporates the June further information; condition 2 limits the permission to the described application. The revised services drawing distinguishes the existing constructed estate and a reserved future-development area from the current completion package.

Why it may matter — interpretation
Builders and civil teams can identify the remaining permitted package without counting the existing estate or reserved phase as fresh supply.

What is not established
Commencement, final compliance agreements and permission for the reserved future-development area are not established.

Inspect the evidence

Final grant notification and conditions · p.1
Final grant: order 26 August 2026, signed 27 August; 8 + 1 + 22 homes · Issued 2026-08-27 · Order 26 August 2026; notification signed 27 August 2026 · Checked 2026-09-07

Final grant: order 26 August 2026, signed 27 August; 8 + 1 + 22 homes

Final grant notification and conditions · p.2
Conditions 1–2: June revised plans and exact application scope · Issued 2026-08-27 · Order 26 August 2026; notification signed 27 August 2026 · Checked 2026-09-07

Conditions 1–2: June revised plans and exact application scope

Further-information site services plan · p.1
Constructed development and Phase 2 FUTURE Development reserved area · Issued 2026-06-25 · J764A-SS01-002 revision 02, response to FI; received 30 June 2026 · Checked 2026-09-07

Constructed development and Phase 2 FUTURE Development reserved area

Private wastewater treatment is temporary and requires a signed connection agreement

Final-grant condition, not evidence of a completed network upgrade

What the evidence says
Condition 17 permits private on-site pre-treatment only as an interim service pending the Ballinabrannagh wastewater-treatment upgrade. After that upgrade, the private plant must be removed and its area landscaped as public open space. No construction may start until a fully signed Uisce Eireann connection agreement is in place. The June services drawing shows the treatment plant, caretaker parking and pre-treated connection route.

Why it may matter — interpretation
Wastewater suppliers and contractors must plan both interim operation and eventual decommissioning, alongside the connection dependency.

What is not established
A signed connection agreement, commissioning, public-plant upgrade completion and installed treatment performance are not established.

Inspect the evidence

Final grant notification and conditions · p.6
Condition 17(a)–(b): interim pre-treatment and subsequent removal · Issued 2026-08-27 · Order 26 August 2026; notification signed 27 August 2026 · Checked 2026-09-07

Condition 17(a)–(b): interim pre-treatment and subsequent removal

Final grant notification and conditions · p.7
Condition 17: signed connection agreement before construction · Issued 2026-08-27 · Order 26 August 2026; notification signed 27 August 2026 · Checked 2026-09-07

Condition 17: signed connection agreement before construction

Further-information site services plan · p.1
Private WWTP, caretaker parking and pre-treated effluent route · Issued 2026-06-25 · J764A-SS01-002 revision 02, response to FI; received 30 June 2026 · Checked 2026-09-07

Private WWTP, caretaker parking and pre-treated effluent route

Attenuation needs a revised material and at least 713 cubic metres

Council-required change to the submitted drainage design

What the evidence says
Condition 15 requires a revised attenuation tank design using a suitable alternative to the proposed plastic open-cell tank, for written approval before commencement. It also requires at least 713 cubic metres of storage, an upstream hydrocarbon interceptor, permeable parking and a 20% climate-change allowance. Surface-water CCTV and as-built drawings are required before occupation.

Why it may matter — interpretation
Drainage and civils procurement should wait for the agreed replacement tank design and include the required survey and handover evidence.

What is not established
The replacement tank material, final agreed design, installed volume and completion surveys are not established.

Inspect the evidence

Final grant notification and conditions · p.6
Condition 15: replace plastic open-cell tank; minimum 713 m3; CCTV and as-built requirements · Issued 2026-08-27 · Order 26 August 2026; notification signed 27 August 2026 · Checked 2026-09-07

Condition 15: replace plastic open-cell tank; minimum 713 m3; CCTV and as-built requirements

Homes need EV connections and certified 3000K public lighting

Final-grant electrical and lighting requirements

What the evidence says
Conditions 11–13 require external electrical connections for future charging at every in-curtilage residential parking space, an agreed LED public-lighting design using 3000K sources, and underground services and broadband ducting. A lighting survey, correction of faults and completion certification are required before first occupation.

Why it may matter — interpretation
Electrical and lighting teams can separate charger readiness from installed chargers and include design approval, testing and certification in the package.

What is not established
Installed chargers, charger ratings, agreed lighting layout and completed certification are not established.

Inspect the evidence

Final grant notification and conditions · p.5
Conditions 11–13: EV connections, 3000K lighting, survey/certification and underground services · Issued 2026-08-27 · Order 26 August 2026; notification signed 27 August 2026 · Checked 2026-09-07

Conditions 11–13: EV connections, 3000K lighting, survey/certification and underground services
Remaining document questions
  • Have the wastewater agreement and revised attenuation design been approved, and has this exact completion phase commenced?

The declared pages of these government-published PDFs were visually inspected. Other catalogue files, later compliance, procurement and installed specifications were not established. Historical weekly membership is retained separately from these document dates.

How we know this

From the Carlow County Council planning register, checked 12 Aug 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Site starts

Commencement notices for this permission

  1. 14 Oct 2026Notice filed · The construction of 8 No. semi-detached 3 bedroom two storey dwellings at sites 46-53...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Ballinabrannagh

Get alerts for BallinabrannaghFree. We email you when new applications appear.

Free email alerts

Get new Ballinabrannagh projects by email

New applications, decisions and site starts in Ballinabrannagh, Co. Carlow. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options