Commercial new build · Co. Carlow

Bagenalstown Industrial Park, Royal Oak Road, Muine Bheag Co. Carlow

Granted 15 Jul 2026

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2660081 at Bagenalstown Industrial Park, Royal Oak Road, Muine Bheag Co. Carlow: 9920 m² light industrial unit incorporating.
  • The applicant is Firtree Developments Ltd. The agent is Liam Minogue.
  • It was received by Carlow County Council on 26 Mar 2026.
  • Status: Granted 15 Jul 2026.
  • Work was due to start on 11 Nov 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Carlow County Council planning register, checked 6 Aug 2026. Open the council's file

Planning applications in Co. Carlow

What and where

9920 m² light industrial unit incorporating

the construction of a 9920 m² light industrial unit incorporating: a single-storey light industrial building; training and warehouse annex with mezzanine; two-storey office and support facilities annex; associated car and bicycle parking and loading areas; two vehicle entrances; completing the existing industrial park access road (as previously permitted under Permission 19/313) with underground services; connection to existing drainage and water infrastructure; hard and soft landscaping and boundary treatments; and all associated works to facilitate the development

Description as published by the council. Its text starts part-way through a sentence.

Location
Co. Carlow Map
Planning reference
2660081

Numbers and dates

Floor area
9,920 m²
Project type
Commercial new build
Received
26 Mar 2026
Granted
15 Jul 2026
Site start notified
11 Nov 2026

Timeline

  1. Application received
  2. Granted
  3. Site start notified

Site history

This site's history

  1. Earlier permission 19313 for this site: granted 15 Sep 2020, commencement notice filed for a start on 7 Feb 2022.

    the construction of 4 No. industrial buildings accessed from the existing industrial park access road, comprising: Unit A (8,283m2) will… Named in this application's description

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

Work was due to start on 11 Nov 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660081 on eplanning.ie: drawings, reports and the decision.Open the council's file

Reviewed build intelligence

What the documents establish

Government document review

Final grant dated 17 August 2026 incorporates the June revision, subject to its conditions. Earlier March design statements are preserved as history; no construction or compliance agreement is established.

3 official documents inspected · Checked 2026-09-06 · Official file index

Final grant covers a 9,920 m² light-industrial unit

Council-conditioned design; construction not established · Carlow reference 2660081; August final grant following March application and June revision

What the evidence says
The final grant is dated 17 August 2026. It covers a 9,920 m² light-industrial building with training and warehouse mezzanine space and a two-storey office/support annex. Condition 1 makes the June further-information revision part of the permitted design and restricts warehousing, training and office uses to ancillary roles; it does not permit retail warehousing.

Why it may matter — interpretation
Interpretation: establishes both the authorised use and which dated design revision governs.

What is not established
A commencement, installed system or completed building is not established.

Inspect the evidence

Bagenalstown industrial unit: final grant · p.2
construction of a 9920m2 light industrial unit · Issued 2026-08-17 · Final notification; 16 conditions · Checked 2026-09-06

construction of a 9920m2 light industrial unit

The June design increases storage and reduces discharge

Council-conditioned design; construction not established · June Issue 3 / revision 02, received 19 June and incorporated by grant condition 1

What the evidence says
The March engineering report states 1,357 m³ of attenuation storage with a 15.2 l/s discharge rate. The June report instead states 2,663 m³ and 9.8 l/s, with approximate tank dimensions of 41.7 m by 16.8 m by 3.8 m. These are successive design versions, not two tanks or quantities to add. The volumes are those reported by the engineer and are not independently recalculated.

Why it may matter — interpretation
Interpretation: exposes a material engineering revision that the original application alone would miss.

What is not established
Final manufacturer, hydraulic verification, installed capacity and commissioning remain unverified.

Inspect the evidence

Revised Engineering and Infrastructure Report · p.8
total storage volume of approximately 2663 m³ · Issued 2026-06-02 · Cover Issue 3; footer revision 02; received 19 June · Checked 2026-09-06

total storage volume of approximately 2663 m³

Original Engineering and Infrastructure Report · p.8
total storage volume of approximately 1,357m³ · Issued 2026-03-11 · Cover Issue 2; footer revision 01; received 26 March · Checked 2026-09-06

total storage volume of approximately 1,357m³

Bagenalstown industrial unit: final grant · p.2
as revised by the further information · Issued 2026-08-17 · Final notification; 16 conditions · Checked 2026-09-06

as revised by the further information

The revised drainage strategy removes the green roof

Council-conditioned design; construction not established · March-to-June report change within the same industrial application

What the evidence says
The March report describes a green roof as an integral part of surface-water management. The June report explicitly states that the development does not include a green roof. It also excludes dedicated rainwater harvesting, permeable paving and tree pits from its proposed drainage strategy. The earlier green-roof statement is retained as version history, not a current works opportunity.

Why it may matter — interpretation
Interpretation: prevents a superseded roof specification being presented as a current package.

What is not established
The reviewed material does not establish a later reinstatement or an installed roof system.

Inspect the evidence

Revised Engineering and Infrastructure Report · p.10
does not include the provision of a green roof · Issued 2026-06-02 · Cover Issue 3; footer revision 02; received 19 June · Checked 2026-09-06

does not include the provision of a green roof

Original Engineering and Infrastructure Report · p.10
green roof therefore forms an integral component · Issued 2026-03-11 · Cover Issue 2; footer revision 01; received 26 March · Checked 2026-09-06

green roof therefore forms an integral component

Bagenalstown industrial unit: final grant · p.2
as revised by the further information · Issued 2026-08-17 · Final notification; 16 conditions · Checked 2026-09-06

as revised by the further information

A 100 mm PE100 loop is specified, with connection conditions

Council-conditioned design; construction not established · June water-supply design and August grant condition 6

What the evidence says
The June report proposes a 100 mm PE100 looped watermain, an entrance bulk-meter chamber and fire hydrants. The final grant requires a Uisce Éireann connection agreement before commencement. It separately requires the third-party wastewater infrastructure owner’s written consent and evidence of receiving-network capacity.

Why it may matter — interpretation
Interpretation: connects the pipe specification to the unresolved service-consent dependencies.

What is not established
Executed agreements, accepted capacity evidence and completed connections have not been inspected.

Inspect the evidence

Revised Engineering and Infrastructure Report · p.12
100 mm diameter PE100 watermain · Issued 2026-06-02 · Cover Issue 3; footer revision 02; received 19 June · Checked 2026-09-06

100 mm diameter PE100 watermain

Bagenalstown industrial unit: final grant · p.3
receiving network has sufficient capacity · Issued 2026-08-17 · Final notification; 16 conditions · Checked 2026-09-06

receiving network has sufficient capacity

The grant requires three interceptors before attenuation

Council-conditioned design; construction not established · August final-grant condition 7, read alongside the revised tank design

What the evidence says
Condition 7 requires three suitably designed, located and maintained interceptors before any surface water enters the attenuation tank. It also requires clean surface-water discharge, a SuDS approach and separation from the foul system. This is a council requirement; the selected interceptor products and completed installation are not established.

Why it may matter — interpretation
Interpretation: distinguishes the definite conditional quantity from the reports’ less specific interceptor wording.

What is not established
Interceptor sizing, selected models and installation evidence remain unverified.

Inspect the evidence

Bagenalstown industrial unit: final grant · p.3
There shall be 3 suitably designed · Issued 2026-08-17 · Final notification; 16 conditions · Checked 2026-09-06

There shall be 3 suitably designed

The final lighting layout still needs written agreement

Council-conditioned design; construction not established · August final-grant condition 5

What the evidence says
Condition 5 ties external lighting to the June further-information details and the council specification. It separately requires a lighting layout showing all proposed locations for written agreement before commencement, and prohibits additional external lighting without prior agreement.

Why it may matter — interpretation
Interpretation: identifies a remaining design-approval dependency without treating proposed fixtures as purchased.

What is not established
An agreed final layout, fixture count, product selection and installation have not been verified.

Inspect the evidence

Bagenalstown industrial unit: final grant · p.3
a Lighting Layout Plan · Issued 2026-08-17 · Final notification; 16 conditions · Checked 2026-09-06

a Lighting Layout Plan
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 3 government-published PDFs were visually inspected. Ninety-two public index rows were retained and nine PDFs accessed. Selected pages of three supporting PDFs were visually inspected; this is not a complete review of all case files. Proposals do not establish procurement or installed work.

How we know this

From the Carlow County Council planning register, checked 6 Aug 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Site starts

Commencement notices for this permission

  1. 11 Nov 2026Notice filed · The construction of a 9920m2 light industrial unit incorporating: a single-storey light...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Co. Carlow

Get alerts for Co. CarlowFree. We email you when new applications appear.

Free email alerts

Get new Carlow projects by email

New applications, decisions and site starts in Co. Carlow. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options