Energy, In the townlands of Ballylennon Burtonhall Demesne, Gorteengrone...
- Replacement (“restringing”) and uprating of c. 5.23km of the existing conductor on the Athy -Carlow 110 kV OHL circuit; - Provision of fibre communication connection on the uprated circuit; - Replacement of 10No. existing Intermediate Wooden Polesets, with similar structures. The replacement of these structures will result...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Eirgrid Plc
- Planning agent
- Jane Myers
- Agent address
- Mott MacDonald 5 Eastgate Avenue Eastgate Little Island Co Cork T45EE72
Application text
- Replacement (“restringing”) and uprating of c. 5.23km of the existing conductor on the Athy -Carlow 110 kV OHL circuit; - Provision of fibre communication connection on the uprated circuit; - Replacement of 10No. existing Intermediate Wooden Polesets, with similar structures. The replacement of these structures will result in standardised heights from 17m to 22m, with height increases between 1m and 2m. 1no. replacement Intermediate Wooden Poleset (structure 106) will be relocated approx. 21m from its current position; - Replacement of 6No. existing Intermediate Wooden Polesets crossarms; - Bar member replacements to 2No. existing steel angle masts and 1No. existing end mast; - Recapping works to be carried out on shear blocks at 2No. existing steel angle masts and 1No. existing end mast; - Foundation strengthening of 1No. existing steel angle mast and 1No. existing end mast; and, - All associated works/development including insulator/hardware replacement (strain clamps, suspension clamps and vibration dampers), replacement of bolt, replacement of line identification and danger notices, painting of angle masts, replacement/installation of anti-climbing guards, access tracks, vegetation clearance, temporary construction compounds and all other works necessary to facilitate the development. A Natura Impact Statement has been prepared and will be submitted to the planning authority with this planning application
Application to site progress
-
Applied 26 May 2026 2660163
-
Decision Conditional 20 Jul 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale 2660163
- Replacement (“restringing”) and uprating of c. 5.23km of the existing conductor on the Athy -Carlow 110 kV OHL circuit; - Provision of fibre communication connection on the uprated circuit; - Replacement of 10No. existing Intermediate Wooden Polesets, with similar structures. The replacement of these structures will result in standardised heights from 17m to 22m, with height increases between 1m and 2m. 1no. replacement Intermediate Wooden Poleset (structure 106) will be relocated approx. 21m from its current position; - Replacement of 6No. existing Intermediate Wooden Polesets crossarms; - Bar member replacements to 2No. existing steel angle masts and 1No. existing end mast; - Recapping works to be carried out on shear blocks at 2No. existing steel angle masts and 1No. existing end mast; - Foundation strengthening of 1No. existing steel angle mast and 1No. existing end mast; and, - All associated works/development including insulator/hardware replacement (strain clamps, suspension clamps and vibration dampers), replacement of bolt, replacement of line identification and danger notices, painting of angle masts, replacement/installation of anti-climbing guards, access tracks, vegetation clearance, temporary construction compounds and all other works necessary to facilitate the development. A Natura Impact Statement has been prepared and will be submitted to the planning authority with this planning application
Open official record