Planning application · Co. Clare
Ballyquin More and Woodpark, Ballyquin, Co. Clare
Under appeal since 29 Sep 2025 (Refused 1 Sep 2025 by the council)
Key facts
- Planning application 2460603 at Ballyquin More and Woodpark, Ballyquin, Co. Clare: Development.
- It was received by Clare County Council on 29 Nov 2024.
- Status: Under appeal since 29 Sep 2025 (Refused 1 Sep 2025 by the council).
- The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.
Source: the Clare County Council planning register, checked 2 Jun 2026. Open the council's file
Since you last looked
Worked out in this browser from the record's own dates.
What and where
Development
for development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Ballyquin, Co. Clare Map
- Council
- Clare County Council
- Planning reference
- 2460603
Numbers and dates
- Received
- 29 Nov 2024
- Council decision
- 1 Sep 2025
- Appeal lodged
- 29 Sep 2025
Timeline
- Application received
- Refused by the council
- Appeal lodged
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2460603 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealUnder appeal · 323758 / 29 Sep 2025View the appeal record
How we know this
From the Clare County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.
Explore the area