Planning application · Co. Clare
Tooreen, Slievenalicka Illaunbaun, Drumbaun and Lackamore Co Clare
Under appeal since 9 Jan 2026 (Refused 4 Dec 2025 by the council)
Key facts
- Planning application 2560520 at Tooreen, Slievenalicka Illaunbaun, Drumbaun and Lackamore Co Clare: Development of Illaunbaun Wind Farm in the townlands of Tooreen.
- It was received by Clare County Council on 27 Aug 2025.
- Status: Under appeal since 9 Jan 2026 (Refused 4 Dec 2025 by the council).
- The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.
Source: the Clare County Council planning register, checked 2 Jun 2026. Open the council's file
What and where
Development of Illaunbaun Wind Farm in the townlands of Tooreen
for the development of Illaunbaun Wind Farm in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind turbines with a maximum overall blade tip height of 150 m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • Three peat repository areas for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes x No The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) & Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the planning authority with the application.
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Slievenalicka Illaunbaun, Co. Clare Map
- Council
- Clare County Council
- Planning reference
- 2560520
Numbers and dates
- Received
- 27 Aug 2025
- Council decision
- 4 Dec 2025
- Appeal lodged
- 9 Jan 2026
Timeline
- Application received
- Refused by the council
- Appeal lodged
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2560520 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealUnder appeal · 500605 / 9 Jan 2026View the appeal record
How we know this
From the Clare County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.