Key facts

  • Planning application 2560529 at Drumline, Co. Clare: (a) 12 no. 2MW Hydrotreated Vegetable Oil.
  • It was received by Clare County Council on 29 Aug 2025.
  • Status: Granted 23 Oct 2025.
  • Permission was granted on 23 Oct 2025 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Clare County Council planning register, checked 2 Jun 2026. Open the council's file

More planning applications in Drumline · Planning applications in Co. Clare

What and where

(a) 12 no. 2MW Hydrotreated Vegetable Oil

for (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182 m² electrical/control building: (e) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.

Description as published by the council. Its text starts part-way through a sentence.

Location
Drumline, Co. Clare Map
Planning reference
2560529

Numbers and dates

Floor area
182 m²
Project type
Infrastructure
Received
29 Aug 2025
Granted
23 Oct 2025

Timeline

  1. Application received
  2. Granted
  3. Appeal lodged

Outlook

What happens next

Permission was granted on 23 Oct 2025 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the Clare County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Drumline

Get alerts for DrumlineFree. We email you when new applications appear.

Free email alerts

Get new Drumline projects by email

New applications, decisions and site starts in Drumline, Co. Clare. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options