Clare County Council / 2560656

Infrastructure, Smithstown Road , Ballycasey More , Shannon Co. Clare - Planning Application 2560656

for proposed development which will consist of the construction of a light industrial manufacturing facility with ancillary office space measuring...

Development Description

for proposed development which will consist of the construction of a light industrial manufacturing facility with ancillary office space measuring circa 3,630m² comprising, A. a naturally lit high-bay workspace and a two-storey annex comprising administration and office spaces, sanitary and staff welfare facilities, B. The provision of external public lighting, a standalone ESB substation and switch room building, an enclosed external building services enclosure and an enclosed waste storage compound, C. Two new site entrances from the perimeter public roadways; a HGV entrance from the north off Smithstown Road to a dedicated goods yard and a second entrance from the east for all other vehicles, D. Parking for 76 cars, of which 17 are EV Charging spaces and 4 are Universal Access spaces, 38 bicycles under a covered shelter and a vehicular set-down zone, E. New ground level corporate signage to be placed at the south-west side of the adjacent roundabout on the Smithstown Road, F. Roof and ground mounted photovoltaic panels, building signage, ancillary soft and hard landscaping and all associated site works and services. The planning application is accompanied by a Natura Impact Statement

EnergyH&S triggerInfrastructure

Map

No coordinates supplied in the public planning feed.

Same county

Related leads nearby

5 records
Clare County Council / 2560489 / 2026-03-23

Shannon, Clare

for 1) Construction of a new 540 m2 fully bunded sodium hypochlorite building with a 60 m2 lower mezzanine floor and 10 m2 upper mezzanine floor, including 2No. external underground brine storage tanks; 2) Construction of a new 102 m2 mezzanine floor extens...

Stage
Commencement
Value band
EUR 500k-1m
Applicant
not yet scraped
Units / floor
units unknown / 744 m2 (floor estimated)
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
Kevin Corry Construction Ltd
EnergyH&S triggerInfrastructureGoing to site
Clare County Council / 25128 / 2026-03-06

Kilkee, Clare

to (1) part demolish, renovate and extend existing dwelling house to include raised roof ridge height with first floor accommodation plus elevational changes, (2) upgrade and relocate foul sewer treatment system, (3) construct new vehicular entrance to form...

Stage
Commencement
Value band
EUR <250k
Applicant
not yet scraped
Units / floor
1 unit / 45.05 m2
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
not yet scraped
H&S triggerInfrastructureVacant / reuse signalGoing to site
Clare County Council / 2560014 / 2025-11-19

Shannon, Clare

for the development which will consist of a 2 storey Community Care Centre, new vehicular entrance, ESB substation, roof mounted PV panels, associated signage (and potentially illuminated signage) and all associated siteworks

Stage
Commencement
Value band
Unknown - verify
Applicant
not yet scraped
Units / floor
units unknown / floor unknown
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
Lymar Contracts Ltd
EnergyH&S triggerInfrastructureGoing to site
Clare County Council / 2560320 / 2025-10-21

Parteen, Clare

to construct a dwellinghouse, garage, domestic wastewater treatment plant, vehicular entrance, connections to services and ancillary site works

Stage
Commencement
Value band
EUR 250k-500k
Applicant
not yet scraped
Units / floor
1 unit / 379 m2
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
not yet scraped
H&S triggerInfrastructureGoing to sitesource=commencement
Clare County Council / 2460390 / 2025-10-20

Kilmurry, Clare

for development which will consist of the provision of a 2-storey dwelling house (237 sq.m), garage (45 sq.m), wastewater treatment plant, new access to the public road and all associated and ancillary works

Stage
Commencement
Value band
EUR 250k-500k
Applicant
not yet scraped
Units / floor
1 unit / 282 m2
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
not yet scraped
H&S triggerInfrastructureGoing to sitesource=commencement