Back to leads
Refused

Energy, Tooreen, Slievenalicka, Drumbaun & Lackamore - Planning Application 2660207

Clare / Drumbaun & Lackamore / Tooreen, Slievenalicka, Drumbaun & Lackamore

Est. value Not listed
Units Not listed
Floor area Not listed
Decision due 6 Jul 2026

Source-linked planning record

Energy, Tooreen, Slievenalicka, Drumbaun & Lackamore - Planning Application 2660207

Clare / Drumbaun & Lackamore / Tooreen, Slievenalicka, Drumbaun & Lackamore
PB ref
PB--3294455350
Plan ref
2660207
Authority
Clare County Council
Stage / date
Refused / 6 Jul 2026
Est. value band
Value not disclosed
Project class
Energy
Promoter
not available yet
Architect / agent
not available yet

Source: http://www.eplanning.ie/ClareCC/AppFileRefDetails/2660207/0

Key facts

Lead summary

Source
Clare County Council public planning register
Planning authority
Clare County Council
Application reference
2660207
Applicant
not available yet
Agent
not available yet
Decision stage
Refused
Decision due
6 Jul 2026

Official description

Verbatim source text

for the development of the Slievenalicka wind turbine in the townlands of Tooreen, Slievenalicka, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • One peat repository area for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the planning application and will be submitted to the Planning Authority with the application

Verify against official source

Project team

Named source parties

Promoter
not available yet
Planning agent
not available yet

Lifecycle timeline

Application to site progress

  1. Applied

    31 Mar 2026 2660207
  2. Decision

    Refused 3 Jul 2026

Likely trades & supplier leads

Inferred from scheme type and scale

ComplianceElectricalFire SafetyHealth & SafetySecuritySolar/Energy
Board this lead Create alert