Infrastructure · Co. Clare
Lindbergh Avenue and Earhart Avenue, Shannon Airport, Co. Clare
Archived record: last seen in the register on 30 Aug 2026
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 30 Aug 2026. The details below are as they were then. The council's register has the current status.
Search the Clare planning registerCurrent planning applications in Shannon Airport
What and where
New MRO Hangar Building
for a new MRO Hangar Building (for the Maintenance, Repair and Overhaul of aircraft), with associated staff accommodation and site works, at Lindbergh Avenue and Earhart Avenue, Shannon Airport, Co. Clare. The development will consist of the construction of; (1) A new building up to two stories, with an overall height of 17.5m, with the ground floor to accommodate a 4 no. bay aircraft MRO hangar, together with ancillary floorspace to include for training facility, storage, toilets, switch, comms and plant rooms. The first floor will provide for staff accommodation, to include for office, canteen, toilets, conference rooms and locker space, with mezzanine space for the airplane bays. The building will include for back-lit corporate branding and signage and roof mounted solar panels. (2) A new vehicular and pedestrian access onto Lindbergh avenue to the east of the site, to provide for pedestrian connection to the existing bus stop on Airport Avenue further to the east, internal circulation areas, 2 no. double gates to a proposed relocated airside boundary, 4 no. taxi apron zones with access to existing airplane taxiway to the west. (3) Demolition / removal of existing outbuilding, tanks, concrete yard and associated hard surface areas. (4) Provision of hangar yard and tug paths, and surface car park to include for provision of accessible parking, electric vehicle charging spaces, sheltered bicycle parking and pedestrian links. (5) A stand-alone single storey chemical & refuse storage building. (6) A stand-alone single storey ESB sub-station/switchroom building, 2 no. generator structures, a Gas Skid installation and 2 no. under-ground static storage water tanks. (7) A proposed foul pumping station and rising main connection to the existing foul sewer network along Earhart Avenue to the east. (8) Revised on-site surface water drainage arrangements including part diversion and replacement of the existing on-site storm sewer, new on-site attenuation and connection to the existing storm sewer. (9) Proposed connection to existing mains water supply infrastructure along Lindbergh Avenue. (10) Excavation of contaminated soil from main site to be relocated to a designated on-site containment berm to the south-east of the site, (11) Infilling and levelling of main site to facilitate construction of proposed development, (12) New boundary treatments including a 2.7m high security mesh fencing around the perimeter, together with all associated site works and service
- Location
- Shannon Airport, Co. Clare Map
- Council
- Clare County Council
- Planning reference
- 2660493
- Applicant
- Wonderlight Ltd
Key facts
- Project type
- Infrastructure
- Received
- 31 Jul 2026
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2660493 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Clare County Council planning register, as last seen on 30 Aug 2026. The council's own file is the official record.
Explore the area