Record 23/5372. Source is the owner-supplied commencement export. PlanningBrief shows lower-risk public fields only; private home addresses are suppressed.
The development will consist of the construction of an office building and 2 No. light industrial units (circa 1308.6 sq.m) consisting of sales, workshops and accessories, storage, welfare facilities, parking for cars and HGV, connection to existing group wastewater treatment system and existing group stormwater system, signage, site fencing, gates and lights using the 2 No. existing site entrances from internal site access roads to include all associated site works.
Fire / FSC likelyMixed useGoing to sitesource=commencement
Map
Project lifecycle links
planning application -> commencement notice filed
1 linked records
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Commencement notice filed - going to site 2024-09-06. Builder: REID Engineering.
Permission for change of use shop premises, former butcher shop, to 3 no. apartments at abbey Street & church road, timoleague, to include development of 1 no. 2 bed 2 storey apartment with attic space, new replacement shop front and windows to abbey st...
Permission for development at the site of the former Port Bar, 2 Victoria Road, Cork City, T12FR84. The proposed development will consist of: (I) The demolition of the single-storey, part two-storey ground and first floor structure to the rear of the existi...
The construction of a 2-4 storey mixed-use building providing 3 no. office/commercial units with undercroft car park, bicycle parking and bin stores at ground floor level and 4 no. apartment (2 no. 3 bed and 2 no. 2 bed) units at upper floors and all ancill...
For permission modifications to Castlewest Shopping Centre consisting of: the amalgamation of 6 no. retails units to form 2 no. retail units; all internal modifications including the removal of the mezzanine level and all ancillary development works.