Temporary/event · Co. Cork
Between Cahir Substation Ballyhenebery, Co. Tipperary and Knockraha Substation Ballynanelagh, Co. Cork
Granted 14 Oct 2025 (final grant issued 21 Nov 2025)
Key facts
- Planning application 24/6468 at Between Cahir Substation Ballyhenebery, Co. Tipperary and Knockraha Substation Ballynanelagh, Co. Cork: Within County Cork.
- It was received by Cork County Council on 23 Dec 2024.
- Status: Granted 14 Oct 2025 (final grant issued 21 Nov 2025).
- Permission was granted on 14 Oct 2025 and the final grant issued on 21 Nov 2025. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Cork County Council planning register, checked 2 Jun 2026. Open the council's file
Since you last looked
Worked out in this browser from the record's own dates.
What and where
Within County Cork
Within County Cork, the proposed development will consist of refurbishment works to 39.3km of overhead line, 14 no. steel towers and 204 no. wooden polesets. These lie between Knockraha Substation, in the townland of Ballynenelagh, and the border with County Tipperary in the townland of Glenduff, crossing the County Cork townlands of: Ballynanelagh, Knockraha East, Meeleen, Shanballyreagh, Barnetstown, Mitchellsfort, Meenane, Skahanagh South, Skahanagh North, Coolquane, Scartbarry, Ballyready, Ballyda, Baneena South, Lackabeha East, Hollyhill, Ballinterry, Clykeel South, Ballynanelagh, Clykeel North, Knockauduff, Ballinvarrig West, Kill-Saint-Anne South, Kill-Saint-Anne North, Ballyoran, Glenarousk, Strawhall, Ballyvadona, Carrigabrick, Gearagh, Carrigatoortane, Mountrivers, Moorepark, Ballyderown, Knockanohill, Glansheskin, Kilclogh, Macroney Upper, Castlecooke, Coolaneague, Curraghanolomer, Ballard, Curraghavoe, and Glenduff. The proposed development includes 4 no. temporary construction compounds in the townlands of Moorepark, Ballinvarrig West, Barnetstown, and Skeheen. The works in County Cork will consist of: the replacement ('restringing') of the existing overhead line (OHL) circuit conductor wires; replacement of 7 no. towers and 82 no. polesets with similar dimensions and heights as the existing; installation of 5 no. new towers and 1 new no. poleset at Barrymore Substation and the removal of 2 no. towers; installation of replacement parts on towers and polesets; foundation refurbishment/strengthening and recapping/clearing of shear blocks; all associated site development works, including temporary works areas; clearance of shear block bases; vegetation maintenance works; ancillary site preparation works, site clearance and levelling at the 4 no. temporary construction compounds, temporary works to existing tracks and new temporary access routes to each structure; and all associated works required to facilitate the proposed development. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
- Location
- Co. Cork Map
- Council
- Cork County Council
- Planning reference
- 24/6468
Numbers and dates
- Project type
- Temporary/event
- Received
- 23 Dec 2024
- Decision to grant
- 14 Oct 2025
- Final grant
- 21 Nov 2025
Timeline
- Application received
- Decision to grant
- Final grant issued
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 24/6468 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Cork County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.