Infrastructure · Co. Cork
Freemount Water Treatment Plant Freemount Charleville Co. Cork
Granted 11 Nov 2025 (final grant issued 17 Dec 2025)
Key facts
- Planning application 25/5128 at Freemount Water Treatment Plant Freemount Charleville Co. Cork: Upgrade works.
- It was received by Cork County Council on 11 Jun 2025.
- Status: Granted 11 Nov 2025 (final grant issued 17 Dec 2025).
- Permission was granted on 11 Nov 2025 and the final grant issued on 17 Dec 2025. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Cork County Council planning register, checked 2 Jun 2026. Open the council's file
Since you last looked
Worked out in this browser from the record's own dates.
What and where
Upgrade works
Permission for upgrade works at the Freemount Water Treatment Plant (WTP). The development will consist of the following: Coagulation, Flocculation and Clarification: Upgrade of poly aluminium chloride (PACI) chemical delivery area, with concrete road sloped to a new drainage gully and dedicated spill tank to contain any potential chemical spills during the delivery process. Disinfection: Install an outdoor bunded chlorine bulk storage tank with a capacity of 2m3 equipped with chemical dosing cabinet. New emergency shower and chemical delivery area for spill containment, new drainage gully connected to dedicated underground spill tank. WTP Residuals: Decommissioning of the existing residual tanks. Refurbishment of the existing used wash water equalization tank (UWWET), including installation of 1 No. mixer and pump replacement. New backwash pump kiosk housing the new backwash pumps and upgraded residuals treatment MCC panel. Installation of 1 No. new 119m3 sludge settlement tank. Installation of a UWWET pumping station. Installation of 1 No. new 16m3 sludge balance tank including for recirculation pumps. Installation of sludge balancing pumping station. Installation of 1 No. new 24m3 picket fence thickener. Installation of a sludge holding tank feed pumping station. Installation of 1 No. new 82m3 sludge holding tank with facility for off-site tankering connection. Ancillary Works: Installation of manholes, access chambers, instrumentation, monitoring equipment & controls in accordance with Uisce Eireann’s technical standards. General groundworks, surfacing, landscaping, ducting, drainage and pipe work associated with the proposed works described above. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
- Location
- Co. Cork Map
- Council
- Cork County Council
- Planning reference
- 25/5128
Numbers and dates
- Project type
- Infrastructure
- Received
- 11 Jun 2025
- Decision to grant
- 11 Nov 2025
- Final grant
- 17 Dec 2025
Timeline
- Application received
- Decision to grant
- Final grant issued
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 25/5128 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Cork County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.