Cork City Council / 2543605

124 dwellings, Barrys Field , Carrigaline Road and , Churchyard Lane - Planning Application 2543605

Permission for the following Large-Scale Residential Development (LRD) located at Barry's Field, Carrigaline Road and Churchyard Lane, Douglas, Cork...

Development Description

Permission for the following Large-Scale Residential Development (LRD) located at Barry's Field, Carrigaline Road and Churchyard Lane, Douglas, Cork, comprising the construction of 124 no. residential apartments (consisting of a mix of 1, 2 and 3 bed units), 1 no. cafe unit and 2 no. office units, in a development ranging in height from 1 to 5 storeys and all associated site development works including footpaths, car and bicycle parking, drainage, bicycle and bin stores, lighting, fencing, landscaping/amenity areas, ESB substation/switchroom and plant room. Site development works include 2 no. new uncontrolled pedestrian crossings and footpath improvements on Churchyard Lane which requires the removal of 6 no. existing on street car parking spaces. The proposed development works include a connection and construction of a new storm water and foul sewer along Carrigaline Road. Access to the site will be via a new vehicle access point and a new pedestrian connection from Carrigaline Road and 2 new pedestrian connections onto Churchyard Lane. The new vehicular access requires the removal of 4 no. existing car spaces. The application may be inspected online at the following website set up by the applicant: www.barrysfieldlrd.com

EnergyFire / FSC likelyH&S triggerMixed use

Map

No coordinates supplied in the public planning feed.

Same county

Related leads nearby

5 records

(i) Construction of 21 no. two storey dwellings comprising 2 no. two bed, 11 no. three bed units and 8 no. four bed units (1 no. detached, 8 no. semi-detached & 12 no. terrace dwellings). Each dwelling is served by a rear garden private amenity space an...

Stage
Granted
Value band
EUR 3m-10m
Applicant
not yet scraped
Units / floor
38 units / floor unknown (units summed from description)
Useful for
ComplianceElectricalFire SafetyFit-outHealth & Safety
Agent
not yet scraped
Fire / FSC likelyH&S triggerMixed use
Cork City Council / ABP-311414-21 / 2024-12-30

Former Millfield Service Station, Cork

Demolitions of existing structures on site and construction of 114 no. Build to Rent Apartments (Comprising a mix of 1 and 2 bed apartments) in 2 no. Blocks ranging in height from 4-9 stories, 1 no. retail unit, residential amenity facilities including a re...

Stage
Commencement
Value band
EUR 30m+
Applicant
Bellmount Developments
Units / floor
114 units / floor unknown
Useful for
ComplianceElectricalFire SafetyFit-outHealth & Safety
Agent
Walls Construction Ltd
Fire / FSC likelyH&S triggerMixed useVacant / reuse signal
Lead page
Cork County Council / 21/7264 / 2024-10-11

Midleton, Cork

We, EMR Projects Ltd, intend to apply for permission for development at this site (6.7 ha) on existing greenfield lands at Knockgriffin (Imokilly) and Water Rock, Midleton, Co. Cork. The application site is bounded by existing fields in agricultural use to ...

Stage
Commencement
Value band
EUR 30m+
Applicant
Marcon Modular Ltd
Units / floor
284 units / 38945 m2 (units estimated, floor estimated)
Useful for
ComplianceElectricalFire SafetyFit-outHealth & Safety
Agent
K& J Townmore Construction
Fire / FSC likelyH&S triggerMixed useVacant / reuse signal
Cork County Council / 22/6627 / 2026-05-29

Midleton, Cork

A ten-year planning permission for the following Large Scale Residential development comprising the construction of 330 no. residential units (199 no. 3 and 4-bed dwelling houses and 131 no. 2 bed apartment units). 136 no. dwelling houses will have the opti...

Stage
Commencement
Value band
EUR 30m+
Applicant
not yet scraped
Units / floor
330 units / floor unknown (units estimated)
Useful for
ComplianceElectricalFire SafetyFit-outHealth & Safety
Agent
Clancy Construction
Fire / FSC likelyH&S triggerMixed useGoing to site
Cork County Council / 22/4298 / 2024-10-11

Midleton, Cork

The demolition of the former Sluagh Hall building [638.39m2] and the construction of 17 no. residential housing units and 1 no. retail/office unit [190.6m2] comprising of 3 no. 1 bed units, 10 no. 2 bed units and 4 no. 3 bed units [apartments and duplex uni...

Stage
Commencement
Value band
EUR 3m-10m
Applicant
CCM Smarthome Developments Ltd
Units / floor
34 units / floor unknown
Useful for
ComplianceElectricalFire SafetyFit-outHealth & Safety
Agent
CCM Smarthome Developments Ltd
Fire / FSC likelyH&S triggerMixed useVacant / reuse signal