Save this project to account
Granted · decision due 15 Sep 2026Decision recorded

~2 dwellings, Eastgate Business Park, Eastgate Road, Kilcoolishal, Little...

Little Island, Cork · Cork County Council · Plan 26/0918 · PB ref PB-2217823426

Permission for the construction of a 2-storey office building (with an option for internal subdivision to provide up to 2 no. units) and 1 no. single storey retail unit, and all associated site development works including access, car and bicycle parking, and bin stores.

Indicative value Not listed PB indicative band
Units applied for 2 public application record
Floor area Not listed no reliable figure indexed
Decision due 15 Sep 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 15 Sep 2026. / Confidence: Low
Decision Grant with Conditions

Decision date 15 Sep 2026.

Open evidence
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

Permission for the construction of a 2-storey office building (with an option for internal subdivision to provide up to 2 no. units) and 1 no. single storey retail unit, and all associated site development works including access, car and bicycle parking, and bin stores.

Ref 26/0918 Source-linked Official application description for exact planning reference 26/0918
Open scope evidence

Public source roles

Eastgate Developments (Cork) Unlimited Company
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

1 package
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

26/0918 Explicit description / Source-linked Source
Confidence & provenance 1 official source
Authority
Cork County Council
Exact reference
26/0918
Evidence reviewed
25 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

2 source-supported signals
Mixed use

Mixed use - 2 dwellings

The public application record identifies 2 dwellings in the submitted planning scope.

26/0918Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

26/0918Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Eastgate Developments (Cork) Unlimited Company
Planning agent
Cailin McNamee

Reviewed build intelligence

What the documents establish

Government document review

Decision recorded; appeal window open and no exact commencement link. Scale reflects the permitted decision record.

8 official documents inspected · Checked 2026-09-19 · Official file index

Access points

Application record · Cork County Council 26/0918 official inventory date 2026-04-13: application scheme as submitted or assessed at that date, evidenced by Appropriate Assessment Screening Report, Engineering Report, Flood Risk Assessment, Lighting Report; any later dated revision is a separate state.

What the evidence says
one location on the site boundary

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Engineering Report · p.6
2.0 CONNECTIVITY AND ACCESS · Issued 2026-04-13 · Cork County Council 26/0918 - Engineering Report (planner_report); official inventory date 2026-04-13; retained revision sha256:e04880164ba4 · Checked 2026-09-19

one location on the site boundary

Gross floor area

Application record · Cork County Council 26/0918 official inventory date 2026-04-13: application scheme as submitted or assessed at that date, evidenced by Appropriate Assessment Screening Report, Engineering Report, Flood Risk Assessment, Lighting Report; any later dated revision is a separate state.

What the evidence says
526 m²

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Flood Risk Assessment · p.8
3.3 Proposed Development · Issued 2026-04-13 · Cork County Council 26/0918 - Flood Risk Assessment (planner_report); official inventory date 2026-04-13; retained revision sha256:67ad0a8db5ab · Checked 2026-09-19

526 m2

Engineering Report · p.5
1.4 Proposed Development · Issued 2026-04-13 · Cork County Council 26/0918 - Engineering Report (planner_report); official inventory date 2026-04-13; retained revision sha256:e04880164ba4 · Checked 2026-09-19

526 m2

Storeys

Application record · Cork County Council 26/0918 official inventory date 2026-09-18: application scheme as submitted or assessed at that date, evidenced by 260918 Notification of Decision TII.pdf; any later dated revision is a separate state.

What the evidence says
2 storeys

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Page 1 · p.1
Page 1 · Issued 2026-09-18 · Cork County Council 26/0918 - 260918 Notification of Decision TII.pdf (decision); official inventory date 2026-09-18; retained revision sha256:e859584cd682 · Checked 2026-09-19

2-storey

Bin stores

Application record · Cork County Council 26/0918 official inventory date 2026-09-18: application scheme as submitted or assessed at that date, evidenced by 260918 Notification of Decision TII.pdf; any later dated revision is a separate state.

What the evidence says
bin stores

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Page 1 · p.1
Page 1 · Issued 2026-09-18 · Cork County Council 26/0918 - 260918 Notification of Decision TII.pdf (decision); official inventory date 2026-09-18; retained revision sha256:e859584cd682 · Checked 2026-09-19

bin stores
Remaining document questions
  • Inspect any later revision the authority replaces at the same URL.
  • Link the commencement and completion events when they arrive.

8 retained official PDF revision(s) from the exact Cork County Council 26/0918 file list. Machine extraction reads bounded passages; drawings are not interpreted.

Official description

Application text

Permission for the construction of a 2-storey office building (with an option for internal subdivision to provide up to 2 no. units) and 1 no. single storey retail unit, and all associated site development works including access, car and bicycle parking, and bin stores.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 26/0918

Permission for the construction of a 2-storey office building (with an option for internal subdivision to provide up to 2 no. units) and 1 no. single storey retail unit, and all associated site development works including access, car and bicycle parking, and bin stores.

AuthorityCork County Council
Reference26/0918
StatusChecked 25 Sep 2026
Open official record