Protected structure · Co. Dublin
52 homes, Dublin 1, Co. Dublin
Under appeal since 23 Jul 2021 (Granted 25 Jun 2021 by the council)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 1 by email
Key facts
- Planning application 2017/21 at Dublin 1, Co. Dublin: 52 homes.
- It was received by Dublin City Council on 8 Jan 2021.
- Status: Under appeal since 23 Jul 2021 (Granted 25 Jun 2021 by the council).
- Work was due to start on 8 Apr 2024, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 1 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 25 Jun 2021.
Appealed to An Coimisiún Pleanála on 23 Jul 2021.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
52 homes
The development will consist of (i) Demolition of existing derelict structures comprising multiple interconnected one and two storey buildings of various age; the removal of existing vehicular entrances at North Great Charles Street and at Tyrrells Places; the removal of security gates and railings at the site perimeter. (ii) Construction of 2 no. apartment blocks ranging from 3 to 6 storeys, connected and served by external access decks and consisting of 52 no. apartments comprising 28 no. one-bed and 24 no. two-bed apartments, along with ancillary circulation cores, plant rooms, cycle store, and bin store, all arranged around a central courtyard amenity space. Upper floor apartments will have balconies onto Great Charles Street, Charles Lane, and Tyrrell Place. Ground floor apartments will have enclosed front yards and private terraces to the rear which adjoin the shared courtyard garden. The development will be served by 76 no. resident cycle space plus 22 no. visitor cycle spaces. Pedestrian/cyclist access to the development will be on Charles Lane. Ground floor apartments located along public street will have own door access from the street. (iii) Construction of a new ESB substation and switchroom adjacent to an existing ESB kiosk to the northern corner of site. (iv) Carrying out of associated site works, works to existing footpaths/kerbs, and landscaping works. (v) Replacement of existing railings at the boundary to Pavee Point (a Protected Structure, RPS Ref: 1370 ‘The Free Church’), railings which are positioned within the development site and outside the curtilage of that structure. The site partially located within the Mountjoy Square Architectural Conservation Area.
- Location
- Dublin 1, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 2017/21
Numbers and dates
- Homes
- 52
- Estimated construction value
- €11m to €17mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Protected structure
- Received
- 8 Jan 2021
- Council decision
- 25 Jun 2021
- Appeal lodged
- 23 Jul 2021
- Site start notified
- 8 Apr 2024
- Protected structure
- Yes
Timeline
- Application received
- Granted by the council
- Appeal lodged
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 2017/21.Search the register
- AppealUnder appeal · 310939 / 23 Jul 2021View the appeal record
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 8 Apr 2024Notice filed · Construction of a 52 unit apartment block, ranging from 3 to 6 storeys, along with all...View the site start