Protected structure · Co. Dublin
Essex House, Essex Gate, Dublin 8, D08 HW56.
Granted 30 Apr 2021 (final grant issued 15 Jun 2021)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 8 by email
Key facts
- Planning application 2355/21 at Essex House, Essex Gate, Dublin 8, D08 HW56.: Change of use from office to residential apartments on first…
- It was received by Dublin City Council on 9 Mar 2021.
- Status: Granted 30 Apr 2021 (final grant issued 15 Jun 2021).
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 8 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 30 Apr 2021.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Change of use from office to residential apartments on first…
PROTECTED STRUCTURE: Planning permission for the proposed development comprises the following: (i) change of use from office to residential apartments on first to fourth floors with office use retained at ground floor and basement level (storeroom); (ii) permission is sought for internal alterations on each floor to remove non-original partition walls and to erect new partition walls to create an open plan office at ground floor and 4no. 1 bed apartments on first to fourth floors. Each apartment will be provided with a lliving/dining/kitchen area, bathroom and double bedroom. The proposed works include the refurbishment of the existing staircase and the incorporation of trickle vents into all sash windows including original sash winows at first floor; (iii) removal of the non-original decorative cornice at ground floor and replacement with a sympathetic run in-situ moulded cornice; (iv) formation of an 800mm wide opening through the original wall on first to fourth floors to create a new access point to the front room of each apartment; (v) upgrading fire and acoustic performace of existing suspended timer floors; (vi) provision of new stairwell connecting the ground floor office to the basement level storeroom. The existing stairwell will serve the apartments only, with access provided to the rear yard and Essex Gate. Access to the office will be provided via a existing entrance on Parliament Street, all comply with part B of the Building Regulations; (vii) removal of existing security bars to the Parliament Street entrance door and the first floor window on rear facade; (viii) replanning the existing WC at ground floor level for disable access; (ix) removal of existing of roof light and reinstating rafters and natural slates to match the existing; (x) provision of a 1 m² automatic air opening vent of area to the roof over the existing stairs; (xi) roof repair and maintenance works; (xii) removal of all non-orignal boxing out and services throughout; (xiii) provision of a new service riser by the lobby to each apartment; (xiv) provision of vents in the rear (west) facade to the yard as well as at roof level to satisfy contemporary ventilation requirements; (xv) provision of a shollow dropped ceiling to the corridor and secondary rooms at ground floor level and locally to the lobby and hall of apartments at first to fourth floors to accommodate ventilation ductwork runs; (xvi) removal of the existing redundant cast iron branch discharge pipe at first floor level on the Essex Gate facade; (xvii) removal of the existing industrial ventilation pipework and the small flat roofed structure in the yard; (xviii) drainage and all associated site development and ancillary works necessary to facilitate developement.
- Location
- Dublin 8, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 2355/21
Numbers and dates
- Project type
- Protected structure
- Received
- 9 Mar 2021
- Decision to grant
- 30 Apr 2021
- Final grant
- 15 Jun 2021
- Site start notified
- 4 Oct 2021
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 2355/21.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 4 Oct 2021Notice filed · Development works include the following: (i) change of use from office to residential...View the site start
- Partial completion certificate recordedRecorded in Oct 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. It covers part of the development, not the whole permission. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area