Protected structure · Co. Dublin
53 Ailesbury Road, Dublin 4
Granted 8 Jun 2021 (final grant issued 23 Jul 2021)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 4 by email
Key facts
- Planning application 2586/21 at 53 Ailesbury Road, Dublin 4: Repair works to 53 Ailesbury Road.
- It was received by Dublin City Council on 14 Apr 2021.
- Status: Granted 8 Jun 2021 (final grant issued 23 Jul 2021).
- Work was due to start on 7 Sep 2021, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 4 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 8 Jun 2021.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Repair works to 53 Ailesbury Road
PROTECTED STRUCTURE: Full planning permission is sought for repair works to 53 Ailesbury Road, Dublin 4; a part two part three storey over semi basement, detached villa type dwelling, ridge height circa 15.6 meters above ground level (protected structure reference 87 on the record of protected structures) as follows: - Repair works to slate roofs including replacement of slate finish and flashings to all roof pitches on a like for like basis, traditional repairs to existing rainwater goods, dormer, rooflights etc; - Replacement of modern roof finishes and ridges with new traditionally detailed metal; - Replacement of roof finishes to central, flat roof area with new membrane roofing system with traditionally detailed metal to south end and fascia, new fall restraint system; - Installation of new paved roof build up to existing first floor terrace roof with new frameless glass balustrade, installation of 2no. new cast iron rainwater pipes and hoppers; - light cleaning of granite facade elements to remove algae and built-up dirt deposits; - Removal of cementitious pointing to 6no. chimneys, new lime pointing to chimneys, localised repairs to lime pointing to facades elsewhere; - Traditional repairs to all sliding sash windows replacement of 4no modern windows and 1no modern door with traditionally detailed timber windows/door; - Installation of ballasted solar collectors to central flat roof area, mechanical upgrades including replacement of boilers and upgrade of thermal controls, retaining all pipework in place
- Location
- Dublin 4, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 2586/21
Numbers and dates
- Project type
- Protected structure
- Received
- 14 Apr 2021
- Decision to grant
- 8 Jun 2021
- Final grant
- 23 Jul 2021
- Site start notified
- 7 Sep 2021
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 2586/21.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 7 Sep 2021Notice filed · Repair works to slate roofs including replacement of slate finish and flashings to all...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.