Site start
Site start — Dublin
Dublin
1 commencement notice · start date 07 Sep 2021 · planning reference given
Planning 2586/21 · Planning application
- Commencement notices
- 1
- Latest start date
- 07 Sep 2021
- Latest notice
- 1,413 m²
- Planning reference
- 2586/21
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Repair works to slate roofs including replacement of slate finish and flashings to all roof pitches on a like for like basis, traditional repairs to existing rainwater goods, dormer, rooflights etc; - Replacement of modern roof finishes and ridges with new traditionally detailed metal; - Replacement of roof finishes to central, flat roof area with new membrane roofing system with traditionally detailed metal to south end and fascia, new fall restraint system; - Installation of new paved roof build up to existing first floor terrace roof with new frameless glass balustrade, installation of 2no. new cast iron rainwater pipes and hoppers; - light cleaning of granite facade elements to remove algae and built-up dirt deposits; - Removal of cementitious pointing to 6no. chimneys, new lime pointing to chimneys, localised repairs to lime pointing to facades elsewhere; - Traditional repairs to all sliding sash windows replacement of 4no modern windows and 1no modern door with traditionally detailed timber windows/door; - Installation of ballasted solar collectors to central flat roof area, mechanical upgrades including replacement of boilers and upgrade of thermal controls, retaining all pipework in place
Floor area stated for this source: 1,413 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.