Site start

Site start — Dublin

Dublin

1 commencement notice · start date 07 Sep 2021 · planning reference given

Planning 2586/21 · Planning application

View full project timeline

Commencement notices
1
Latest start date
07 Sep 2021
Latest notice
1,413 m²
Planning reference
2586/21
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Repair works to slate roofs including replacement of slate finish and flashings to all roof pitches on a like for like basis, traditional repairs to existing rainwater goods, dormer, rooflights etc; - Replacement of modern roof finishes and ridges with new traditionally detailed metal; - Replacement of roof finishes to central, flat roof area with new membrane roofing system with traditionally detailed metal to south end and fascia, new fall restraint system; - Installation of new paved roof build up to existing first floor terrace roof with new frameless glass balustrade, installation of 2no. new cast iron rainwater pipes and hoppers; - light cleaning of granite facade elements to remove algae and built-up dirt deposits; - Removal of cementitious pointing to 6no. chimneys, new lime pointing to chimneys, localised repairs to lime pointing to facades elsewhere; - Traditional repairs to all sliding sash windows replacement of 4no modern windows and 1no modern door with traditionally detailed timber windows/door; - Installation of ballasted solar collectors to central flat roof area, mechanical upgrades including replacement of boilers and upgrade of thermal controls, retaining all pipework in place

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,413 m².

Planning reference 2586/21

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.