Protected structure · Co. Dublin
14/15, Kildare Street, Dublin 2
Granted 22 Nov 2021 (final grant issued 7 Jan 2022)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 2 by email
Key facts
- Planning application 3221/21 at 14/15, Kildare Street, Dublin 2: ~4 homes.
- It was received by Dublin City Council on 27 Jul 2021.
- Status: Granted 22 Nov 2021 (final grant issued 7 Jan 2022).
- Work was due to start on 5 Dec 2022, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 2 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 22 Nov 2021.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
~4 homes
PROTECTED STRUCTURE: For development at this site at No. 14-15 Kildare Street, Dublin 2, Protected Structures ref: 4200 (No. 14) and 4201 (No.15) under the Dublin City Council Record of Protected Structures. The development will consist of the change of use from commercial to residential use, partitioning and all required alterations of 4 no. units in No.14 Kildare Street as follow: Unit C, - 60.90sq.m, 2 bedroom dwelling at First Floor Level; Unit E- 60.90sq.m, 2 bedroom dwelling at Second Floor Level; Unit G- 60.90sq.m, 2 bedroom dwelling at Third Floor Level; Unit 1- 55.20.m, 2 bedroom dwelling at Fourth Floor Level. The development also consists of the change of use of a basement plant room area in No. 15 into residential use - Unit A, 59. 00sq.m, 1 bedroom apartment. The development also consists refurbishment and alteration works to 4 no existing residential units in No. 15 Kildare Street: Unit B-33.85sq.m, Bedsit Unit at Ground Floor Level; Unit D-58.25sq.m, 1 bedroom unit at First Floor Level; Unit F- 58.25sq.m, 1 bedroom dwelling at Second Floor Level and Unit H-58.25sq.m, 1 bedroom dwelling at Third Floor Level as well as the refurbishment of WC and storage areas in the stair core area to the rear of the buildings. The proposed development includes the replacement of all windows to the front and rear elevations to no. 14 & 15. The development also includes the following works to No. 15: alteration to external openings at basement level, minor repairs to the brick front façade, re-setting and re-pointing flags to entrance landing, replacement and upgrading of existing electrical and plumbing services, replacement and upgrading of all existing vents and provision for new extract vent openings in No. 14, repairs and upgrading to internal walls and ceilings, dry lining, fire upgrading of existing timber floors, replacement of internal doors and strengthening of existing floors, replacement and upgrading of all kitchenette and bathroom fittings, wall and floor finishes. The development will also include all ancillary site and services works.
- Location
- Dublin 2, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 3221/21
Numbers and dates
- Homes
- ~4estimated from the application
- Floor area
- 391 m²
- Project type
- Protected structure
- Received
- 27 Jul 2021
- Decision to grant
- 22 Nov 2021
- Final grant
- 7 Jan 2022
- Site start notified
- 5 Dec 2022
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 3221/21.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 5 Dec 2022Notice filed · Change of use and refurbishment of existing commercial units to 9no. residential units...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.