Mixed use · Co. Dublin
76, 76G & 280 Bannow Road, Cabra, Dublin 7
Granted on appeal 5 Jul 2021 (Granted 8 Jan 2021 by the council)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 7 by email
Key facts
- Planning application 3308/20 at 76, 76G & 280 Bannow Road, Cabra, Dublin 7: 69 homes.
- It was received by Dublin City Council on 3 Sep 2020.
- Status: Granted on appeal 5 Jul 2021 (Granted 8 Jan 2021 by the council).
- Work started on site on 25 Jun 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 7 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 8 Jan 2021.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
69 homes
The proposed development will consist of the construction of a ‘Build to Rent’ residential development comprising of 69 no. apartments (51 no. 1 beds, 18 no. 2 beds) in 2 no. blocks, to be provided as follows: Block A – a four storey building containing a total of 20 no. apartments comprising of 3 no. 1 beds, 17 no. 2 beds with balconies to north, south and east elevations with ancillary residential amenity facilities including concierge and residential lounge at ground level; Block B – a five storey building containing a total of 49 no. apartments comprising of 48 no. 1 beds, 1 no. 2 beds with balconies to south elevations; a single level basement comprising a total of 33 no car parking spaces, 3 no. motorcycle spaces, 148 no. bicycle parking spaces (128 no. spaces at basement level and 20 no. spaces at ground floor level), ancillary plant room and refuse storage areas; along with a play/activity room, gym facility, utility room in support of the Build to Rent ancillary residential amenities and support facilities; vehicular and pedestrian access will be onto Bannow Road. Construction of a basement level social and community centre/non-residential club (Class 10) unit for the relocation of the Cabra Pigeon Racing Club which will maintain its separate access from the eastern boundary of application site providing access onto Bannow Road; The double height retail unit located at 76 Bannow Road will be modified with a new roof structure, extension and modification to front elevation (south), modifications to north east and west elevations, signage and internal floor area and will be integrated into Block A of the development proposal; Landscaping, boundary treatment, drainage, signage, green roofs and solar pv panels to roof level of Blocks A and B, and all associated site and infrastructure works necessary to facilitate the development. The proposed development will also consist of the demolition of the existing two-storey building located at 280 Bannow Road (known as the Alma Hygiene building together with a kickboxing club) the demolition of the existing single storey warehouse unit and racing pigeon club unit at 76G Bannow Road (known as the Dublin Circus Centre and Cabra Racing Pigeon Club Building) and the demolition of all associated structures on site in order to facilitate the development. The subject site is bounded by Bannow Road to the south, ‘The Coach House’ and Hamilton Square to the west, Broombridge LUAS stop and maintenance depot to the north and a gated service laneway which provides separate access to Cabra Racing Pigeon Club’s Clubhouse to the east.
- Location
- Dublin 7, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 3308/20
Numbers and dates
- Homes
- 69
- Floor area
- 33 m²
- Estimated construction value
- €15m to €22mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Mixed use
- Received
- 3 Sep 2020
- Council decision
- 8 Jan 2021
- Appeal lodged
- 4 Feb 2021
- Granted on appeal
- 5 Jul 2021
- Site start
- 25 Jun 2026
Timeline
- Application received
- Granted by the council
- Appeal lodged
- Appeal decidedGrant permission with conditions
- Site start
Site history
This site's history
-
Application 3308/20/X1 at the same address: granted 6 Oct 2026.
EXT. OF DURATION: The proposed development will consist of the construction of a ‘Build to Rent’ residential development comprising of 69… Same address -
Application 3308/20Sub03 at the same address: received 20 Oct 2026, no decision recorded yet.
14. The following transport and traffic requirements shall be adhered to: i) Prior to commencement of development, and on appointment of a… Same address -
Application 3308/20Sub02 at the same address: received 12 Aug 2026, no decision recorded yet.
28. The developer shall comply with the following requirements of Transport Infrastructure Ireland: Prior to the commencement of the… Same address
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 3308/20.Search the register
- AppealGrant permission with conditions · 309366 / 5 Jul 2021View the appeal record
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 25 Jun 2026Work started · Construction of Residential Development comprising of 54 No. apartments and Basement for...View the site start