- Planning application 3325/19 at Co. Dublin: Interconnection of second.
- It was received by Dublin City Council on 21 Jun 2019.
- Status: Granted 17 Dec 2019 (final grant issued 28 Jan 2020).
- Work was due to start on 11 Mar 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
Council register
The council's register shows: Granted on 17 Dec 2019.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Interconnection of second
PROTECTED STRUCTURE: Planning permission for the following: (a) Interconnection of second, third and fourth floors of Dollard House with the half-landings of a late twentieth century internal staircase of The Clarence Hotel and the construction of a lightweight bridging structure/corridor in the Clarence Hotel at aforementioned three levels to connect through new openings in the external cladding of a late twentieth century stairs located in an internal lightwell, with lightweight cladding to match; (b) Dollard House only: change of use of second, third and fourth floors from vacant offices to hotel use, comprising 56 bedrooms and ancillary spaces. Dollard House was originally interconnected to and formed part of The Clarence Hotel on these three levels: the construction of new lightweight stud partitions, doors and ceilings forming bedrooms and corridors; the forming of openings at second, third and fourth floor levels in the east wall, (which had previously existing window openings); the reinstatement of a window opening on the south elevation of the north wing at second floor level; replacement of the existing late twentieth century aluminium windows with historically appropriate timber framed windows to the north elevation facing Wellington Quay and steel framed windows to the window openings facing the internal lightwell and the south elevations facing East Essex Street.
- Location
- Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 3325/19
Numbers and dates
- Floor area
- 56 m²
- Estimated construction value
- €210k to €300kOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Protected structure
- Received
- 21 Jun 2019
- Decision to grant
- 17 Dec 2019
- Final grant
- 28 Jan 2020
- Site start notified
- 11 Mar 2025
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 3325/19.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 11 Mar 2025Notice filed · The works covered by this 7-Day Notice include the proposed material change of use and...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.