Mixed use · Co. Dublin
~144 homes, Co. Dublin
Granted 1 Dec 2025
We no longer update this application, so we can't email you about it. Get new planning applications in Co. Dublin by email
Key facts
- Planning application 3367/25 at Co. Dublin: ~144 homes.
- It was received by Dublin City Council on 1 Sep 2025.
- Status: Granted 1 Dec 2025.
- Work started on site on 29 Jul 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 13 Oct 2026. Open the council's file
Council register
The council's register shows: Granted on 1 Dec 2025.
Application details as we last saw them in the national register on 13 Oct 2026.
What and where
~144 homes
PLANNING AND DEVELOPMENT ACT 2000 (AS AMENDED) PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED) -PART8 Proposal: Pursuant to the requirements above Notice is hereby given of the proposal to construct 144 no apartments and associated development at a site of c. 1.16 Ha at Bannow Road, Cabra West, Dublin 7, which will consist of the following: • Demolition of the existing single storey industrial building, which has a gross floor area (GFA) of 1,455 sq.m • Construction of a residential development with a total of 144 no apartments (71 no. 1 beds, 63 no. 2 beds, and 10 no. 3 beds) in two residential buildings (Block A and B); • Block A is part 3 to part 6 storeys in height and includes 40 no apartments (18 no 1 beds, 21 no. 2 beds and 1 no. 3 bed). Balconies and terraces are provided on all elevations; • Block B is part 3 to part 6 storeys in height and includes 104 no. units (53 no. 1 beds, 42 no. 2 beds and 9 no. 3 beds). Balconies and terraces are provided on all elevations; • Provision of residential courtyards at ground level to serve the apartments: • 25 no car parking spaces to serve the apartments 4 no. car share spaces and 3 no. drop-off/ loading bay spaces • 227 no. long stay and 72 no. short stay bicycle parking spaces to serve the apartments; • Provision of 420 sq.m of community/cultural floorspace in Block A (380 sq.m internal space at ground floor level and 40 sq.m of associated external area): • Provision of 78 sq.m of community floorspace at ground floor level of Block B; • Provision of 2 no long stay and 6 no short stay bicycle spaces to serve the community /cultural uses • Provision of public open space including central area public open space and public realm improvements • Boundary treatments, public lighting, site drainage works, green roofs, PV panels, internal road surfacing and footpaths, ESB meter rooms, ESB substation, utility and services connections bin and cycle storage, plant rooms landscaping and levelling of ground reserved for proposed Luas extension operations; and development. • All associated development. The proposal has undergone Appropriate Assessment Screening in accordance with Article 6(3) of the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU. as amended by Directive 2014/52/EU In accordance with Article 81 of the Planning & Development Regulations 2001, as amended, the Planning Authority has made a determination and concluded that: (a) The proposed development, either individually or in combination with other plans and projects, is not likely to have a significant effect on any European site(s) and therefore a Stage 2 Appropriate Assessment is not required. (a) There is no real likelihood of significant effects on the environment arising from the proposed development and that the proposed development is not of a class set out under Schedule 5 of the Planning and Development Regulations 2001, as amended, and therefore does not require an Environmenta Impact Assessment Report (EIAR). Any person may within A weeks from the date of pubilication of this notice, apply to An Bord Pleanála for a screening determination as to whether the development would be likely to have significant effects on the envronment Pians and Particulars of the proposed development may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy tor a period of 4 weeks from 01/09/2025, during Public opening hours at the offices of Dublin City Council, Public Counter, Planning and Property Development Department, Block 4, Ground Floor, Civic Offices, Wood Quay Dublin Monday - Friday 9.00am to 4.30pm The plans and particulars are also available for inspection online: https://engage.dublincity.ie and on the City Council's website www.dublincity.ie. A submission or observation in relation to the proposed development dealing with the proper planning and sustainable development of the area In which the development would be situated may be made, in writing to the Executive Manager, Planning and Property Development Department. Dublin City Council, Civic Offices, Wood Quay, Dublin 8, before 4.30pm on 13/10/2025 Submissions or observations may also be made online https://engage.dublincity.ie or on the City Council's website www.dublincity.ie before 23.59hrs on 13/10/2025
- Location
- Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 3367/25
- Application type
- Local Authority Works
Numbers and dates
- Homes
- ~144estimated from the application
- Floor area
- 1,455 m²
- Estimated construction value
- €31m to €45mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Mixed use
- Received
- 1 Sep 2025
- Granted
- 1 Dec 2025
- Site start
- 29 Jul 2026
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 3367/25 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Dublin City Council planning register, as last seen on 13 Oct 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 29 Jul 2026Work started · Apartment Block B, Bannow Road, Cabra West - a 6 storey apartment block comprising of...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.