Dublin City Council / 3529/22

Infrastructure, Dublin, Dublin - Planning Application 3529/22

PROTECTED STRUCTURE: PERMISSION & RETENTION: Planning permission and retention permission is sought for revisions to the granted residential...

Official file link not supplied Map Street View Council hub
Older archived record

This lead has left the active PlanningBrief feed but remains available for shared and reference links. It is excluded from current listings and the sitemap.

Browse current leads
Source: Owner-supplied commencement export

Record 3529/22. Source is the owner-supplied commencement export. PlanningBrief shows lower-risk public fields only; private home addresses are suppressed.

Open council hub

Development Description

PROTECTED STRUCTURE: PERMISSION & RETENTION: Planning permission and retention permission is sought for revisions to the granted residential development Reg. Ref. 4105/15 (An Bord Pleanála Ref. PL29N.246430) as extended under Reg. Ref. 4105/15/X1 and as amended by Reg. Ref. 2813/17. Permission is sought to amend condition 16 (c) of Reg. Ref. 4105/15 to permit the removal of existing tree Nos. 410, 411 & 412 to the rear of permitted dwelling nos. 36, 37 and 38. Permission is sought for the change of house type of Dwelling Nos. 39 - 50 from House Type J, H & K (three-storey, five-bedroom, terraced dwellings) to House Type L, M & N (three-storey, four-bedroom terraced dwellings) all provided with first-floor rear terrace. Permission is also sought for amendments to permitted internal road and parking spaces as well as the minor re-location of permitted dwellings 39-50 to accommodate 1 no. additional dwelling three-storey, 4 no. bed terraced dwelling (House Type N4) with first floor rear terrace and 2 no. car parking spaces (Dwelling No. 51). The development will provide for a total of 51 no. residential dwellings in lieu of the permitted 50 residential dwellings. Planning permission is also sought to omit the permitted ESB substation as well as all ancillary site and landscaping works necessary to facilitate the development. Retention permission is also sought for 2 no. entrance porches to the front and side elevations of the Protected Structure (at No.1 and No. 2 The Hermitage) which were originally permitted to be demolished/removed under Reg. Ref. 4105/15.

EnergyH&S triggerInfrastructureGoing to sitesource=commencement

Map

Same county

Related leads nearby

5 records
Dublin City Council / 4899/22 / 2025-08-25

Dublin, Dublin

PROTECTED STRUCTURE: The development will consist of: The change of use of Rockfield House from an existing vacant convalescent home to hospital administration facilities and including for the refurbishment of the building (Existing GFA: 805.9 sq.m, Propose...

Stage
Commencement
Est. value band
EUR 1m-3m
Applicant
HSE Estates
Units / floor
units unknown / 1700.6 m2
Useful for
ComplianceConservation specialistElectricalGroundworksHealth & Safety
Agent
Bell Contracts and Co Ltd
EnergyH&S triggerInfrastructureProtected structure

Source: Owner-supplied commencement export / source record not directly linked

Lead page Map
Dublin City Council / WEB5317/25 / 2026-04-06

Dublin, Dublin

The proposed development comprises a change of use of the permitted Retail/Restaurant unit (439 sq.m) at ground floor level (under Planning Ref. 3475/19, as amended by Ref. 2742/20) to a Brewpub (combination of a microbrewery and a public house / restaurant...

Stage
Commencement
Est. value band
EUR 1m-3m
Applicant
not available yet
Units / floor
units unknown / 1365 m2
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & Safety
Agent
not available yet
Fire / FSC likelyH&S triggerInfrastructureVacant / reuse signal

Source: Owner-supplied commencement export / source record not directly linked

Lead page Map
Dublin City Council / 4144/24 / 2026-02-27

Dublin, Dublin

Permission for development will consist of refurbishment, renovation and retrofitting works to an existing building (Dublin Port Centre and associated ancillary works, comprising: Reglazing and insulation upgrades to all building facades to include installa...

Stage
Commencement
Est. value band
EUR 10m-30m
Applicant
Dublin Port Company
Units / floor
units unknown / 5589 m2
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
John Sisk & Son Holding Ltd
EnergyH&S triggerInfrastructureGoing to site

Source: Owner-supplied commencement export / source record not directly linked

Lead page Map
Dublin City Council / WEB2190/24 / 2026-04-06

Dublin, Dublin

Damon McCaul (Headmaster) intends to apply for permission for development at Gonzaga College, Sandford Road, Dublin 6, D06 KF95. The development will consist of: the internal reconfiguration and full renovation of an existing 2 storey science block (c. 830 ...

Stage
Commencement
Est. value band
EUR 250k-500k
Applicant
not available yet
Units / floor
units unknown / 24 m2
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & Safety
Agent
McKeon Contech Ltd T/a McKeon Group
EnergyFire / FSC likelyH&S triggerInfrastructure

Source: Owner-supplied commencement export / source record not directly linked

Lead page Map
Dublin City Council / WEB5451/25 / 2026-01-30

Dublin, Dublin

PERMISSION & RETENTION. The Board of St James’s Hospital intends to apply for planning permission and retention permission for development at this site, St James’s Healthcare Campus, St James’s Street, Dublin 8. The development for which planning permis...

Stage
Commencement
Est. value band
EUR 250k-500k
Applicant
not available yet
Units / floor
units unknown / 399 m2
Useful for
ComplianceElectricalGroundworksHealth & SafetyMain contractor
Agent
Moston Construction Ltd
H&S triggerInfrastructureGoing to sitesource=commencement

Source: Owner-supplied commencement export / source record not directly linked

Lead page Map