Planning record · Co. Dublin

Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82)

Granted 7 May 2021 (final grant issued 22 Jun 2021)

We no longer update this application, so we can't email you about it. Get new planning applications in Co. Dublin by email

Key facts

  • Planning application 3624/20 at Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82): 75 MWe.
  • It was received by Dublin City Council on 23 Oct 2020.
  • Status: Granted 7 May 2021 (final grant issued 22 Jun 2021).

Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register

Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 7 May 2021.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

75 MWe

The Electricity Supply Board (ESB) intends to apply for planning permission for development on a c. 5.6 ha site located within the existing Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82), which is licenced by the Environmental Protection Agency (EPA) under an Industrial Emissions (IE) Licence [Ref. P0577-03]. The development will consist of a 75 MWe (electrical output) aero derivative gas fired turbine for the generation of electricity and will include the following elements: (a) c. 240 sq.m. aero derivative gas fired turbine module up to c. 15.6 m high with a c. 30 m high stack; (b) ancillary buildings including: c. 128 sq.m., c. 6 m high gas compressor building; c. 18 sq.m., c. 5 m high liquid fuel forwarding pumps building; c. 80 sq. m., c. 5 m high fire fighting pumps building; c. 209 sq. m., c. 5.4 m high water treatment plant building; c. 48 sq. m., c. 6 m high gas reducing building; c. 12.6 sq. m., c. 2.7 m high continuous emissions monitoring (CEMS) hut; c. 90.1 sq. m., c. 4.7 m high electrical equipment module; c. 90.1 sq. m., c. 4.7 m high control & instrumentation (C&I) communications module; c. 90.1 sq. m., c. 4.7 m high plant control module (PCM); c. 90.1 sq. m., c. 4.7 m high welfare facilities building; c. 39.6 sq. m., c. 3 m high fire suppression and compressed air system building; (c) industrial/ electrical plant including: c. 22.2 sq.m., c. 2.6 m high emergency diesel generator; c. 28 sq.m., c. 4 m high gas compressor cooler; de-mineralised water tank (c. 12 m high, c. 1,540 cubic metre capacity); c. 36 sq.m., c. 2.6 m high spare parts storage container; bunded liquid fuel tank (c. 9 m high, c. 182 cubic metre capacity); raw / fire water tank (c. 14 m high, c. 2,044 cubic metre capacity); c. 11.1 sq. m., c. 2.2 m high fire suppression cabinet; c. 3 sq. m., c. 2.4 m high liquid fuel forwarding skid; c. 7.5 sq. m., c. 1.8 m high water wash cart; c. 3.8 sq. m., c. 3.3 m high lube oil skid; c. 1,309 sq. m., c. 6.5 m high fenced transformer compound; c. 21 sq. m., c. 6.6 m high generator circuit breaker; c. 97 sq. m., c. 5 m high fin fan coolers; c. 11 sq. m., c. 3.7 m high water injection skid; c. 10.9 sq. m., c. 2.5 m high bunded house transformer; (d) various boundary and internal fencing and gates with different treatments including securi-mesh (c. 2.4 m high), palisade (c. 2.6 m high), and chainlink (c. 2.7 m high); (e) ancillary site clearance and development works including provision of areas of hardstanding and car parking, internal access roads, pipe bridges, onsite drainage and attenuation, temporary construction laydown area; and connections to site services networks including: telecommunications, gas, liquid fuel, electrical, water supply, surface water drainage/ attenuation, and wastewater. The primary access will be via the existing Poolbeg Generating Station entrance at Pigeon House Road with a temporary construction access via the existing entrance off the road immediately south of the site. The proposed development is for the purposes of an activity requiring a licence from the Environmental Protection Agency under the Industrial Emissions Directive. An Environmental Impact Assessment Report (EIAR) which complies with the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 (S.I. 296 of 2018) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, during office hours at the offices of the planning authority. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council during its public opening hours and a submission or observation in relation to the application may be made to the Authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the application. The application may also be viewed or downloaded on the Department of Housing, Planning and Local Government's EIA Portal located at https://housinggovie.maps.arcgis.com/apps/webappviewer/index.html?id=d7d5a3d48f104ecbb206e7e5f84b71f1.

Location
Dublin 4 (eircode), Co. Dublin Map
Planning reference
3624/20

Numbers and dates

Floor area
2,696 m²
Project type
Planning record
Received
23 Oct 2020
Decision to grant
7 May 2021
Final grant
22 Jun 2021
Site start notified
9 Oct 2023

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Outlook

What happens next

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference 3624/20.Search the register

How we know this

From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Site starts and completion

  1. 9 Oct 2023Notice filed · phase 1 · Proposed installation of a container housing Continuous Emissions Monitoring System...View the site start
  2. 22 Feb 2024Notice filed · phase 2 · The proposed development consists of the installation of a new industrial container...View the site start
  3. Completion certificate recordedRecorded in Oct 2023 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
  4. Completion certificate recordedRecorded in Feb 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 4 (eircode)

Get alerts for Co. DublinFree. We email you when new applications appear.

Free email alerts

Get new Dublin projects by email

New applications, decisions and site starts in Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options