Protected structure · Co. Dublin

House 10, The Chief Steward's House and Perimeter Railings, Trinity College, Dublin 2

Granted 22 Jan 2021 (final grant issued 8 Mar 2021)

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 2 by email

Key facts

  • Planning application 3764/20 at House 10, The Chief Steward's House and Perimeter Railings, Trinity College, Dublin 2: Provost.
  • It was received by Dublin City Council on 19 Nov 2020.
  • Status: Granted 22 Jan 2021 (final grant issued 8 Mar 2021).

Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register

More planning applications in Dublin 2 · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 22 Jan 2021.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Provost

PROTECTED STRUCTURE: The Provost, Fellows, Foundation Scholars and the other members of the Board of the College of the Holy and Undivided Trinity of Queen Elizabeth near Dublin apply for planning permission for development of House 10 (a protected structure ref. 1999), the Chief Steward's House and Perimeter Railings (a protected structure ref. 2001) Trinity College, Dublin 2. The development will consist of the following works: - Modifications to the ground floor of House 10 (protected structure ref 1999) to provide a new universal access route from Front Square to the Chief Steward's House Garden including removal of an existing window and formation of a new doorway in the north elevation of House 10; - The installation of a new step to House 10 Front Square entrance formed in extant Leinster granite, new salvage Leinster granite with a concealed concrete base, the addition of a Universal Access Ramp and changes to cobble stones and the provision of new granite paving slabs. The replacement of the existing door to this entrance; - Change of use of the Chief Steward House (190 m²) from Office to Residential use providing 5 no bed/sitting rooms with ensuite bathrooms and communal kitchen/dining facilities over two storeys; - Repairs to the ashlar front (north) facade of the Chief Steward's House and the replacement of existing cement render with lime render to chimney stack, side and rear elevations; - Modification of the Perimeter Railings (a protected structure ref: 2001) and existing pedestrian gate to College Street to include raising the level of the gate to match College Street footpath level; - New foul and storm water drainage systems connections. Existing downpipes to front elevation to connect directly to the drainage system. - Associated site developments and landscaping including new pathway from the new doorway formed in House 10 to the Chief Stewards House with universal access ramp.

Location
Dublin 2, Co. Dublin Map
Planning reference
3764/20

Numbers and dates

Floor area
190 m²
Project type
Protected structure
Received
19 Nov 2020
Decision to grant
22 Jan 2021
Final grant
8 Mar 2021
Site start notified
27 Sep 2021
Protected structure
Yes

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Outlook

What happens next

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference 3764/20.Search the register

How we know this

From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Site starts and completion

  1. 27 Sep 2021Notice filed · Modifications to House 10 to provide an access route through to the CSH. Refurbishment...View the site start
  2. Completion certificate recordedRecorded in Sep 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 2

Get alerts for Dublin 2Free. We email you when new applications appear.

Free email alerts

Get new Dublin 2 projects by email

New applications, decisions and site starts in Dublin 2, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options