Site start · Co. Dublin
Dublin, Dublin
Site start 21 Oct 2024
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.
What and where
PROTECTED STRUCTURE
PROTECTED STRUCTURE: The development will consist of the redevelopment of the Anglesea Stand to provide a new 3 level grandstand (6,775 person capacity), a 2 level (storey) hospitality and services building (Pocket Building), a club shop and substation (overall 8,892 sq.m. [enclosed areas 3,713 sq.m., concourse areas 2,037 sq.m. with views facing onto the judging rings, External Upper and Lower Tier stand of 3,142 sq.m.]) with concrete, painted steel, metal panels, render and glass finishes to structures. The proposal will comprise: A) Demolition of the existing Anglesea Stand and Anglesea Terrace structure (approx. 7,716 sq.m.), 'lean-to' open fronted shed bounding Simmonscourt Road (approx. 145 sq.m.) and removal of modern terrace (approx. 44 sq.m.) area surrounding the clock tower (a protected structure Ref. No. 5085); B) Provision of a new grandstand (7,599 sq.m.) over 3 levels, 21.3m [26.8m OD] in height (with associated floodlighting and acoustic public address within roof of new stand) with a connection (via a glazed bridge link at Level 01) to the new pocket building of (1,175 sq.m. GFA) comprising a 2 level (storey) 10.17m [16.41m OD] in height building including plant (89 sq.m.) at roof level (within a louvered cover) to the east. The roof to the new grandstand will include a zone to enable the installation of photovoltaic array. The new grandstand and pocket building will accommodate seating; security/control rooms; corridor/ circulation areas; bar/servery areas; WC facilities [including disabled & staff facilities]; stores/cold rooms; season ticket/ VIP hospitality areas; and ancillary plant/electric areas. The internal arrangement of the enclosed Level 01 area of the new grandstand and new pocket building (and ancillary areas) will be flexible to accommodate rugby, horse show and other event requirements; C) A single storey substation (c. 50 sq.m.) 3.6m in height [9.92m OD] located to the east of existing South Stand; and a single storey double height club shop (C. 49 (sq.m.) 6.7m in height [12.2m OD] located adjacent to existing RDS office building; D) Terrace areas at Level 00 and Level 01 within the new pocket building on southern façade as well as views from all levels towards parade rings from the new grandstand and new pocket building; E) Provision of signage zones (overall 135.5 sq.m) to north (16 sq.m) and south (115 sq.m) elevations of the new grandstand and north (2 sq.m) and east (2.5 sq.m) elevations of proposed club shop; F) Revised landscaping to north of the new grandstand and external areas to include the removal of trees; G) Revisions to surface water, drainage, attenuation, storage, telecommunication, servicing arrangements and connections including all associated site development and landscaping works; H) Provision of additional bicycle parking; and; I) All existing access arrangements and parking provision will remain as per the established layout and operation of the RDS complex.
- Location
- Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 3937/23
- Agent
- Elliott Building & Civil Engineering Ltd
- Builder
- Elliott Building & Civil Engineering Ltd
Key facts
- Floor area
- 10,193 m²
- Indicative value
- €30m+PlanningBrief estimate
- Project type
- Temporary/event
- Site start
- 21 Oct 2024
- Protected structure
- Yes
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 3937/23.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 21 Oct 2024Work started · Site set-up and demolition of the existing Anglesea Stand and associated site clearance...
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.