Protected structure · Co. Dublin

57 Pembroke Road, Dublin 4

Granted 10 Dec 2024 (final grant issued 31 Jan 2025)

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 4 by email

Key facts

  • Planning application 4361/24 at 57 Pembroke Road, Dublin 4: Fabric repair works.
  • It was received by Dublin City Council on 22 Oct 2024.
  • Status: Granted 10 Dec 2024 (final grant issued 31 Jan 2025).
  • Work was due to start on 3 Jul 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Dublin City Council planning register, as last seen on 5 Oct 2026. Search the council's register

More planning applications in Dublin 4 · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 10 Dec 2024.

Application details as we last saw them in the national register on 5 Oct 2026.

What and where

Fabric repair works

PROTECTED STRUCTURE: 10 year permission. The development will consist of: (a) Fabric repair works: (i) Main Roof: Strip slates; salvage re-usable slates; dispose of fibre/asbestos slates. Salvage ridge and hip tiles and reinstate when roof is slated; Provide matching replacement for any missing or damaged beyond repair. Re- slate the roof using salvaged original natural stone slates on the outer slopes as far as possible and new matching natural stone slates on the inner slopes, on breathable membrane using treated battens. Strip all parapet and valley gutters; adjust, repair, and/or replace if necessary valley boarding to suit new copperwork. Lay new copper gutters. Repair, or if necessary replace, existing flashings and cover flashings. Re-form rainwater outlets. Repair roof structural timbers and wall-plates, including cutting and splicing any rotten timbers. Remove existing Velux type roof-lights and replace as indicated on drawings. Remove existing 'dormer type' access to roof, and replace with Velux type roof-light in the plane of the roof. Provide roof insulation; (ii) External walls: Brickwork to front elevation: Repair, or replace if necessary, damaged bricks. Rake out and repoint brickwork with lime mortar - wigged pointing to match original. Brickwork to rear elevation: Carry out minor repairs to brickwork and pointing. Rendered wall finishes: Carry out structural repairs to cracks as detailed on structural engineer's drawings: Hack off loose, damaged or hollow areas of render and re-render to match original; clean and re-decorate. Masonry walls: gently clean to remove surface dirt; complete minor repairs to Granite Ashlar and Chanelled Granite Ashlar walling and pointing. Provide all necessary lead flashings and cover flashings. Concrete frame to modern extension: Carry out repair works as detailed on structural engineer's drawings and make good. (iii) Parapet walls: Carry out all necessary remedial and structural repairs which become apparent after opening-up; Repair metalwork as necessary; redecorate. (iv) Chimney stacks: Carry out all necessary re- building/repair works including repointing wigged finish to match existing. (Extent of re-building to be determined by Conservation Architect after stacks are opened-up). Repair, or replace if necessary, damaged chimney pots to match originals; Repair or replace flashings as necessary. (v) Windows: carry out all necessary repairs to timber frames and sashes if feasible: If not feasible, replace windows on like for like basis by conservation specialist joinery manufacturer. Cills/ surrounds: Repair cracks in granite cills and fill all holes. Repair, or if necessary replace, rendered reveals, and apply new mastic joint with window frames. (vi) Railings/ Security Frames: Check all fixings/supports and repair as required; check for expansion where built into walls and repair as necessary including any cracks in the masonry walls. (vii) Boundaries: Repair front boundary railings and granite plinth as necessary: (viii) Rainwater disposal: Repair, or if necessary replace, rainwater goods; Clean out all gutters, hopper heads, rainwater pipes and leave water-tight and in good working order; re-decorate on completion as required. (b) Provide Electric Vehicle polemounted charge point in front car-parking area.

Location
Dublin 4, Co. Dublin Map
Planning reference
4361/24

Numbers and dates

Project type
Protected structure
Received
22 Oct 2024
Decision to grant
10 Dec 2024
Final grant
31 Jan 2025
Site start notified
3 Jul 2026
Protected structure
Yes

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Outlook

What happens next

Work was due to start on 3 Jul 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Conservation work to a protected structureNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference 4361/24.Search the register

How we know this

From the Dublin City Council planning register, as last seen on 5 Oct 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 3 Jul 2026Notice filed · External repairs to walling and roof of 57 Pembroke Road. Works to roof to include the...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 4

Get alerts for Dublin 4Free. We email you when new applications appear.

Free email alerts

Get new Dublin 4 projects by email

New applications, decisions and site starts in Dublin 4, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options