Protected structure, 57 Pembroke Road, Dublin 4

Dublin 4, Dublin · Dublin City Council · Plan 4361/24 · PB ref PB-10000194247

PROTECTED STRUCTURE: 10 year permission. The development will consist of: (a) Fabric repair works: (i) Main Roof: Strip slates; salvage re-usable slates; dispose of fibre/asbestos slates. Salvage ridge and hip tiles and reinstate when roof is slated; Provide matching replacement for any missing or damaged beyond repair. Re...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision 10 Dec 2024 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Protected structure

The protected-structure designation is source evidence and can shape specification and method.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 10 Dec 2024. / Confidence: Low
Decision GRANT PERMISSION

Decision date 10 Dec 2024.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

PROTECTED STRUCTURE: 10 year permission. The development will consist of: (a) Fabric repair works: (i) Main Roof: Strip slates; salvage re-usable slates; dispose of fibre/asbestos slates. Salvage ridge and hip tiles and reinstate when roof is slated; Provide matching replacement for any missing or damaged beyond repair. Re- slate the roof using salvaged original natural stone slates on the outer slopes as far as possible and new matching natural stone slates on the inner slopes, on breathable membrane using...

Ref 4361/24 Source-linked Official application description for exact planning reference 4361/24

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Dublin City Council
Exact reference
4361/24
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

2 source-supported signals
Protected structure

Protected structure

The public application record identifies protected structure in the submitted planning scope.

4361/24Explicit application record
Conservation

Protected-structure / conservation scope

The public application description explicitly references protected-structure / conservation scope.

4361/24Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

PROTECTED STRUCTURE: 10 year permission. The development will consist of: (a) Fabric repair works: (i) Main Roof: Strip slates; salvage re-usable slates; dispose of fibre/asbestos slates. Salvage ridge and hip tiles and reinstate when roof is slated; Provide matching replacement for any missing or damaged beyond repair. Re- slate the roof using salvaged original natural stone slates on the outer slopes as far as possible and new matching natural stone slates on the inner slopes, on breathable membrane using treated battens. Strip all parapet and valley gutters; adjust, repair, and/or replace if necessary valley boarding to suit new copperwork. Lay new copper gutters. Repair, or if necessary replace, existing flashings and cover flashings. Re-form rainwater outlets. Repair roof structural timbers and wall-plates, including cutting and splicing any rotten timbers. Remove existing Velux type roof-lights and replace as indicated on drawings. Remove existing 'dormer type' access to roof, and replace with Velux type roof-light in the plane of the roof. Provide roof insulation; (ii) External walls: Brickwork to front elevation: Repair, or replace if necessary, damaged bricks. Rake out and repoint brickwork with lime mortar - wigged pointing to match original. Brickwork to rear elevation: Carry out minor repairs to brickwork and pointing. Rendered wall finishes: Carry out structural repairs to cracks as detailed on structural engineer's drawings: Hack off loose, damaged or hollow areas of render and re-render to match original; clean and re-decorate. Masonry walls: gently clean to remove surface dirt; complete minor repairs to Granite Ashlar and Chanelled Granite Ashlar walling and pointing. Provide all necessary lead flashings and cover flashings. Concrete frame to modern extension: Carry out repair works as detailed on structural engineer's drawings and make good. (iii) Parapet walls: Carry out all necessary remedial and structural repairs which become apparent after opening-up; Repair metalwork as necessary; redecorate. (iv) Chimney stacks: Carry out all necessary re- building/repair works including repointing wigged finish to match existing. (Extent of re-building to be determined by Conservation Architect after stacks are opened-up). Repair, or replace if necessary, damaged chimney pots to match originals; Repair or replace flashings as necessary. (v) Windows: carry out all necessary repairs to timber frames and sashes if feasible: If not feasible, replace windows on like for like basis by conservation specialist joinery manufacturer. Cills/ surrounds: Repair cracks in granite cills and fill all holes. Repair, or if necessary replace, rendered reveals, and apply new mastic joint with window frames. (vi) Railings/ Security Frames: Check all fixings/supports and repair as required; check for expansion where built into walls and repair as necessary including any cracks in the masonry walls. (vii) Boundaries: Repair front boundary railings and granite plinth as necessary: (viii) Rainwater disposal: Repair, or if necessary replace, rainwater goods; Clean out all gutters, hopper heads, rainwater pipes and leave water-tight and in good working order; re-decorate on completion as required. (b) Provide Electric Vehicle polemounted charge point in front car-parking area.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
PlanningCouncil planning register
  1. Applied 22 Oct 2024 4361/24
  2. Decision Grant Permission 10 Dec 2024
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 4361/24

PROTECTED STRUCTURE: 10 year permission. The development will consist of: (a) Fabric repair works: (i) Main Roof: Strip slates; salvage re-usable slates; dispose of fibre/asbestos slates. Salvage ridge and hip tiles and reinstate when roof is slated; Provide matching replacement for any missing or damaged beyond repair. Re- slate the roof using salvaged original natural stone slates on the outer slopes as far as possible and new matching natural stone slates on the inner slopes, on breathable membrane using treated battens. Strip all parapet and valley gutters; adjust, repair, and/or replace if necessary valley boarding to suit new copperwork. Lay new copper gutters. Repair, or if necessary replace, existing flashings and cover flashings. Re-form rainwater outlets. Repair roof structural timbers and wall-plates, including cutting and splicing any rotten timbers. Remove existing Velux type roof-lights and replace as indicated on drawings. Remove existing 'dormer type' access to roof, and replace with Velux type roof-light in the plane of the roof. Provide roof insulation; (ii) External walls: Brickwork to front elevation: Repair, or replace if necessary, damaged bricks. Rake out and repoint brickwork with lime mortar - wigged pointing to match original. Brickwork to rear elevation: Carry out minor repairs to brickwork and pointing. Rendered wall finishes: Carry out structural repairs to cracks as detailed on structural engineer's drawings: Hack off loose, damaged or hollow areas of render and re-render to match original; clean and re-decorate. Masonry walls: gently clean to remove surface dirt; complete minor repairs to Granite Ashlar and Chanelled Granite Ashlar walling and pointing. Provide all necessary lead flashings and cover flashings. Concrete frame to modern extension: Carry out repair works as detailed on structural engineer's drawings and make good. (iii) Parapet walls: Carry out all necessary remedial and structural repairs which become apparent after opening-up; Repair metalwork as necessary; redecorate. (iv) Chimney stacks: Carry out all necessary re- building/repair works including repointing wigged finish to match existing. (Extent of re-building to be determined by Conservation Architect after stacks are opened-up). Repair, or replace if necessary, damaged chimney pots to match originals; Repair or replace flashings as necessary. (v) Windows: carry out all necessary repairs to timber frames and sashes if feasible: If not feasible, replace windows on like for like basis by conservation specialist joinery manufacturer. Cills/ surrounds: Repair cracks in granite cills and fill all holes. Repair, or if necessary replace, rendered reveals, and apply new mastic joint with window frames. (vi) Railings/ Security Frames: Check all fixings/supports and repair as required; check for expansion where built into walls and repair as necessary including any cracks in the masonry walls. (vii) Boundaries: Repair front boundary railings and granite plinth as necessary: (viii) Rainwater disposal: Repair, or if necessary replace, rainwater goods; Clean out all gutters, hopper heads, rainwater pipes and leave water-tight and in good working order; re-decorate on completion as required. (b) Provide Electric Vehicle polemounted charge point in front car-parking area.

AuthorityDublin City Council
Reference4361/24
StatusChecked 2 Jun 2026
Open official record