Protected structure · Co. Dublin
Nos. 9, 10, Ardee Street corner St. Luke's Avenue, Dublin 8, D08KP9P
Granted 17 Feb 2023 (final grant issued 4 Apr 2023)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 8 by email
Key facts
- Planning application 5457/22 at Nos. 9, 10, Ardee Street Corner St. Luke's Avenue, Dublin 8, D08KP9P: Refurbishment and change of use of No.10 Ardee Street.
- It was received by Dublin City Council on 16 Dec 2022.
- Status: Granted 17 Feb 2023 (final grant issued 4 Apr 2023).
- Work was due to start on 13 Mar 2024, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 8 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 17 Feb 2023.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Refurbishment and change of use of No.10 Ardee Street
PROTECTED STRUCTURE: The development will consist of the refurbishment and change of use of No.10 Ardee Street (protected structure), a 3 storey over basement building from part dwelling, part office use to office use only; the construction of a part 3-storey with roof terrace and a part 4-storey extension with flat roof to the North and East of No. 10 Ardee Street to provide office accommodation and lift/stairs; the provision of a 1-storey bicycle and bin store with green roof; 12No. bicycle parking spaces and 1 No. car parking space in the courtyard along with provision of a new pedestrian entrance off St. Luke's Avenue along with all associated landscape, conservation and site development works including a new boundary wall to eastern boundary. The proposed works to No.10 Ardee Street (protected structure) include the demolition of 3-storey extension to North known as "The Annex" and 1-storey toilet structure to rear (East); the removal and strip out of other non-original partitions; the reinstatement of windows to rear at ground floor and doors and windows to basement; the adjustment of internal opes into the extension at No.9 Ardee Street at ground, first and second floors with 2no new door openings at ground and first floor level; localised repointing to façades; structural strengthening where required.
- Location
- Dublin 8, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 5457/22
Numbers and dates
- Project type
- Protected structure
- Received
- 16 Dec 2022
- Decision to grant
- 17 Feb 2023
- Final grant
- 4 Apr 2023
- Site start notified
- 13 Mar 2024
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Site history
This site's history
-
Application 5457/22Sub05 at the same address: received 16 Oct 2026, no decision recorded yet.
7. The developer shall comply with the following requirements of the City Archaeologist: d) Where archaeological material is shown to be… Same address
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 5457/22.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 13 Mar 2024Notice filed · The development will consist of the refurbishment and change of use of a protected...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area