Infrastructure · Co. Dublin

Infrastructure works, Dublin 1, Co. Dublin

Granted 17 Jul 2020

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 1 by email

Key facts

  • Planning application DSDZ2626/20 at Dublin 1, Co. Dublin: Infrastructure works.
  • It was received by Dublin City Council on 14 Apr 2020.
  • Status: Granted 17 Jul 2020.

Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register

More planning applications in Dublin 1 · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 17 Jul 2020.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Infrastructure works

Permission at a site (c. 1.08 Ha) at Coopers Cross, City Block 3 (including No. 8 Castleforbes Road, Dublin 1), at Sheriff Street Upper, Castleforbes Road and Mayor Street Upper, North Lotts, Dublin 1 and otherwise generally bounded by Mayor Street Upper to the south, undeveloped lands to the west, existing Northbank House and Alexandra Terrace to the north and Castleforbes Road to the east. The proposed development seeks revisions to previously permitted commercial scheme, DCC Reg. Ref. DSDZ4087/19 (the 'parent permission') comprising: - Minor adjustments to the locations of the stairs / lift core of Building 1 (Block 3E) and Building 2 (Block 3F) and associated rationalisation of floor layouts of all levels from basement to 5th floor including adjustments to 5th floor terrace and associated alterations to northern elevation of Building 2 (Block 3F); Relocation of ground floor retail/cafe/restaurant unit (c. 110 sq.m) in Building 2 (Block 3F) fronting onto Castleforbes Road to Building 1 (Block 3E) fronting onto the permitted Middle Park (DCC Reg. Ref. DSDZ4112/19 refers) split over ground floor level and lower ground floor level to provide cafe / restaurant use (c. 382 sq.m) and associated new entrance to lower level of pedestrian split level street between Building 1 (Block 3E) and Building 2 (Block 3F); Introduction of a new office entrance at Ground Floor level of Building 2 (Block 3F) fronting onto Castleforbes Road; Modifications of the public realm including adjustments to landscaping design and layout associated with the pedestrian split level street between Building 1 (Block 3E) and Building 2 (Block 3F) and alterations to the northern steps (leading towards Sheriff Street Upper) to facilitate more convenient access to the permitted Middle Park (DCC Reg. Ref. DSDZ4112/19 refers), new lightwell to southern elevation of Building 1 (Block 3E) fronting Mayor Street Upper and adjustment of lightwell to western elevation of Building 1 (Block 3E) fronting new street proposed as part of adjoining permitted residential scheme (DCC Reg. Ref. DSDZ2186/20; Relocation of the bicycle access stairs to bicycle parking at basement level from Building 2 (Block 3F) fronting onto Castleforbes Road to Building 1 (Block 3E) from the new street proposed as part of adjoining permitted residential (DCC Reg. Ref. DSDZ2186/20); Amendment to southern facades of Building 1 (Block 3E) and Building 2 (Block 3F); and all associated and ancillary site development works, landscaping works and boundary treatment works or as otherwise permitted under DCC Reg. Ref. DSDZ4087/19. The adjustments result in a gross floor area of 46,757 sq.m including basement (an overall increase in gross floor area by 1,429 sq.m). This application relates to a proposed development within the North Lotts & Grand Canal Dock Strategic Development Zone Planning Scheme area.

Location
Dublin 1, Co. Dublin Map
Planning reference
DSDZ2626/20

Numbers and dates

Floor area
48,186 m²
Project type
Infrastructure
Received
14 Apr 2020
Granted
17 Jul 2020
Site start notified
1 Sep 2020

Timeline

  1. Application received
  2. Granted
  3. Site start notified

Outlook

What happens next

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Basement parkingNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference DSDZ2626/20.Search the register

How we know this

From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Site starts and completion

  1. 1 Sep 2020Notice filed · phase 1 · “Commercial Development forming part of Cooper Cross development at Dublin Docklands...View the site start
  2. 4 Jan 2021Notice filed · phase 2 · Remainder of the Landlord works to Buildings 1 & 2. Building 1 from Lower Ground Floor...View the site start
  3. 8 Apr 2021Notice filed · phase 3 · “The construction of a mixed commercial/retail building to Building 1 & 2View the site start
  4. Completion certificate recordedRecorded in Sep 2020 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
  5. Completion certificate recordedRecorded in Apr 2021 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 1

Get alerts for Dublin 1Free. We email you when new applications appear.

Free email alerts

Get new Dublin 1 projects by email

New applications, decisions and site starts in Dublin 1, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options