Site start
Commercial site start — Dublin
Dublin 1, Dublin
3 commencement notices · latest start date 08 Apr 2021 · planning reference given
Planning DSDZ2626/20 · Planning application
- Commencement notices
- 3
- Latest start date
- 08 Apr 2021
- Latest notice
- 94,514 m²
- Planning reference
- DSDZ2626/20
- Location
- 8 Castleforbes Road, Dublin 1
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
Addresses on the notices
- 8 Castleforbes Road, Dublin 1
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
“The construction of a mixed commercial/retail building to Building 1 & 2 at the Coopers Cross Commercial Development. The works consist of a mixed commercial/ retail use 2 No. 7 Storey Office Buildings over a common Basement. Note these works are subsequent to those covered under two separate Commencement Notice submissions commencement notice, Ref 8448634 and commencement notice Ref 8434915.”
Floor area stated for this source: 94,514 m².
Remainder of the Landlord works to Buildings 1 & 2. Building 1 from Lower Ground Floor slab to Roof Level including the installation of services and finishes to the Building 1 Basement. The Basement Liner wall. Building 2 above the Basement slab to Roof Level. All associated Landlord works. Coopers Cross Commercial Development. The Core and Columns at Lower Ground Floor were also included. The Retail areas will have a Grey Box Fit-Out including the installation of a Fire Alarm system, an Emergency Lighting system and a Lift. The balance of the Fit Out works to the Retail spaces will be by the in-coming tenant. (Note: The Civil & Structural Basement works to the Basement Slab and the Building 1 core and columns at Basement Level were part of the separate commencement notice Ref 8448634 Commencement Notice submission).
Floor area stated for this source: 94,514 m².
“Commercial Development forming part of Cooper Cross development at Dublin Docklands. The works involved includes the basement concrete slab and associated works.”
Floor area stated for this source: 18,312 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.