Planning application · Co. Dublin

Kilshane Road, Kilshane, Finglas, Dublin 11.

Granted on appeal 16 May 2024 (Granted 23 Jun 2023 by the council)

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 11 by email

Key facts

  • Planning application FW22A/0204 at Kilshane Road, Kilshane, Finglas, Dublin 11.: New Gas Turbine Power Generation Station with an output of up to 293…
  • The applicant is Kilshane Energy Ltd. The agent is Cwpa Planning & Architecture.
  • It was received by Fingal County Council on 13 Sep 2022.
  • Status: Granted on appeal 16 May 2024 (Granted 23 Jun 2023 by the council).
  • Work was due to start on 25 Sep 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Fingal County Council planning register, as last seen on 13 Oct 2026. Open the council's file

More planning applications in Dublin 11 · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 23 Jun 2023.

Application details as we last saw them in the national register on 13 Oct 2026.

What and where

New Gas Turbine Power Generation Station with an output of up to 293…

The proposed development will consist of the following: 1. The construction of a new Gas Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine and 1 no. 28 m high Exhaust Stack partially enclosed by a 12 m high acoustic wall. 1 no. single storey Admin Building and Warehouse (c. 926 m²), 1 no. single storey Packaged Electronic/Electrical Control Compartment (PEECC) (c. 72 m²), 1 no. single storey Continuous Emission Monitoring System (CEMS) Shelter (c. 14.8 m²), 1 no. 16.2m high x 024.4m Fuel Oil Tank, 1 no. 15.3m high x 09.2m Raw/Fire Water Tank, 1 no. 16.2m high x 018.3m Demin Water Tank, and miscellaneous plant equipment. 2. The demolition of a detached residential dwelling (c. 142 m² GFA) and associated farm buildings (c. 427 m² GFA) located in the north west corner of the subject site to facilitate the proposed development. 3. Road improvement works to 493.34 m Kilshane Road (L3120), including the realignment of a portion of the road (293.86 m) within the subject site boundary and the provision of new footpaths, off-road cycle ways, together with the construction of a new roundabout linking the proposed realignment of Kilshane Road back to the existing road network to the northeast of the subject site and to the proposed internal road network to serve the proposed development. 4. The construction of entrance gates, low wall and railings fronting the realigned Kilshane Road and a private internal road network providing for vehicular, cyclist and pedestrian access to serve the development. Construction of 3 m high security fencing within development. S. Total provision of 26 no. car parking spaces including 1 no. disabled persons parking space and 2 no. EV electrical charging points. 6. Provision of security lighting columns to serve the development and the installation of Closed-Circuit Television System (CCTV) for surveillance and security purposes. 7. Provision of 20 no. sheltered bicycle parking spaces. 8. Provision of hard and soft landscaping works, tree planting and boundary treatments including 3 m high security fence along Kilshane Road and the perimeter of the subject site boundary. 9. Provision of new on-site foul sewer pumping station to serve the development. 10. Provision of underground surface water attenuation areas to serve the development. All associated site development and excavation works, above and below ground, necessary to facilitate the development. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. This application relates to a development that will require an Industrial Emissions Directive licence from the Environmental Protection Agency. A subsequent application will be submitted for an Above Ground Installation (AGI) compound, underground gas supply installation and a subsequent Strategic Infrastructure Development (SID) Application will also be submitted for a Gas-Insulated Switchgear Substation (GIS), Air Insulated Switchgear Substation (AIS) and grid connection to serve the development. AI received 11/01/23 SAI received 18/01/23 CAI Recieved 24/04/2023 SAI received 03/05/23

Location
Dublin 11, Co. Dublin Map
Planning reference
FW22A/0204
Application type
Permission
Applicant
Kilshane Energy Ltd
Agent
Cwpa Planning & Architecture

Numbers and dates

Floor area
1,582 m²
Received
13 Sep 2022
Council decision
23 Jun 2023
Appeal lodged
30 Jun 2023
Granted on appeal
16 May 2024
Site start notified
25 Sep 2026

Timeline

  1. Application received
  2. Granted by the council
  3. Appeal lodged
  4. Appeal decidedGrant permission with revised conditions
  5. Site start notified

Site history

This site's history

  1. Application FW22A/0204/C16/16 at the same address: refused 9 Nov 2026.

    Compliance submission with Condition 16 of Register Reference FW22A/0204 (ABP-317480-23) Same address

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

Work was due to start on 25 Sep 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file FW22A/0204 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
  • AppealGrant permission with revised conditions · 317480 / 16 May 2024View the appeal record

How we know this

From the Fingal County Council planning register, as last seen on 13 Oct 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 25 Sep 2026Notice filed · phase 1 · Proposed Gas Turbine, Gas Turbine Generator and Auxiliaries Enclosure Building...View the site start
  2. 25 Sep 2026Notice filed · phase 2 · Raised Packaged Electronic Electrical Control Building comprising 144.5 m² in floor...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 11

Get alerts for Dublin 11Free. We email you when new applications appear.

Free email alerts

Get new Dublin 11 projects by email

New applications, decisions and site starts in Dublin 11, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options