Large residential · Co. Dublin

1. Amendments to previously permitted Blocks C1, Blackrock, Co. Dublin

Granted 28 Jul 2026

Key facts

  • Planning application LRD26A/0051/WEB at Blackrock, Co. Dublin: Amendments to previously permitted Blocks C1.
  • It was received by Dun Laoghaire Rathdown County Council on 30 Jan 2026.
  • Status: Granted 28 Jul 2026.
  • Permission was granted on 28 Jul 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Dun Laoghaire Rathdown County Council planning register, as last seen on 26 Aug 2026. Search the council's register

More planning applications in Blackrock · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 28 Jul 2026.

Application details as we last saw them in the national register on 26 Aug 2026.

What and where

1. Amendments to previously permitted Blocks C1

1. Amendments to previously permitted Blocks C1, C2, C3, D1, E1, E2, E3, E4 and

Location
Blackrock, Co. Dublin Map
Planning reference
LRD26A/0051/WEB
Application type
Permission (LRD)
Get alertsDownload PDF

Numbers and dates

Project type
Large residential
Received
30 Jan 2026
Granted
28 Jul 2026
Protected structure
Yes

Timeline

  1. Application received
  2. Further information requested
  3. Granted

Outlook

What happens next

Permission was granted on 28 Jul 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference LRD26A/0051/WEB.Search the register

Reviewed build intelligence

What the documents establish

Government document review

The appeal concerns an amendment to ABP-303804-19. The May 2026 EIAR distinguishes amended blocks from unchanged permitted blocks. The current Commission description refers to 252 units while the EIAR describes 414 units across the permitted and proposed development together; these different source scopes are not converted into a single current project total.

3 official documents inspected · Checked 2026-09-05 · Official file index

The amendment changes specified blocks, not every permitted building

Proposed in application · Amended blocks in the May 2026 submission, against permission ABP-303804-19

What the evidence says
The EIAR scope table says the amendment relates to C1, C2, C3, D1, E1, E2 and G; former E3, E4 and E5 are removed. A1, B1, B2, B3, B4 and H remain as permitted without proposed changes in this application.

Why it may matter — interpretation
Interpretation: prevents engineering quantities and material needs being assigned indiscriminately to every block.

What is not established
The EIAR’s combined 414-unit context and the Commission’s 252-unit description are not treated as interchangeable. No current whole-development or added-unit headline is published.

Inspect the evidence

EIAR Chapter 2: Site Context and Development Description · p.28
Removal of Former Blocks E3, E4 and E5 · Issued Not stated · Received 29 May 2026; states no chapter revision was needed for the March further-information request; received 2026-05-29 · Checked 2026-09-05

Removal of Former Blocks E3, E4 and E5

Two separately connected attenuation systems in the EIAR site design

Proposed in application · Whole EIAR-site drainage design, including retained permission context; not solely the new amendment’s quantities

What the evidence says
The hydrology chapter describes 905 m³ in a Stormtech below-ground attenuation structure north of Block D and 905 m³ in a reinforced-concrete tank beside B2 under the road. Each connects independently to the council collection system with a Hydro-brake or similar flow control.

Why it may matter — interpretation
Interpretation: identifies different underground storage constructions and separate hydraulic connections.

What is not established
These are proposed source-specific capacities, not procurement quantities or evidence that both systems are newly required by the amendment. Final detailed design and approved substitutions are not established.

Inspect the evidence

EIAR Chapter 8: Hydrology · p.15
Hydro-brake or similar · Issued Not stated · Received 29 May 2026; states no chapter revision was needed for the March further-information request; received 2026-05-29 · Checked 2026-09-05

Hydro-brake or similar

Later review calls for coordinated foundation and construction controls

Reviewer recommendation · 20 July 2026 review of further information, following the earlier March assessment gap

What the evidence says
The July review considers the revised piling and bedrock assessment satisfactory and recommends conditions requiring agreement of piling and foundation details before foundation construction, plus an updated detailed construction environmental management plan before works. It identifies noise, vibration, groundwater, nearby structures and underground services as matters to address.

Why it may matter — interpretation
Interpretation: points to foundation design, monitoring and construction-method coordination still to be resolved through later conditions and submissions.

What is not established
These are the reviewer’s recommended conditions. This document does not prove that the decision adopted them, that a condition was discharged, or that foundations have started.

Inspect the evidence

Review of Further Information: Land, Soils, Geology and Hydrogeology · p.2
The response is considered satisfactory. · Issued 2026-07-20 · P26176-FT-EGN-XX-RP-EN-0001, five-page review · Checked 2026-09-05

The response is considered satisfactory.

Review of Further Information: Land, Soils, Geology and Hydrogeology · p.3
The revised mitigation measures · Issued 2026-07-20 · P26176-FT-EGN-XX-RP-EN-0001, five-page review · Checked 2026-09-05

The revised mitigation measures

Review of Further Information: Land, Soils, Geology and Hydrogeology · p.4
Recommended Planning Conditions · Issued 2026-07-20 · P26176-FT-EGN-XX-RP-EN-0001, five-page review · Checked 2026-09-05

Recommended Planning Conditions
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 3 government-published PDFs were visually inspected. Three later PDFs inspected on the listed pages. Earlier chapter and March review were downloaded/text searched for revision context but are not counted as visually inspected technical evidence. Proposals do not establish procurement or installed work.

How we know this

From the Dun Laoghaire Rathdown County Council planning register, as last seen on 26 Aug 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Blackrock

Get alerts for BlackrockFree. We email you when new applications appear.

Free email alerts

Get new Blackrock projects by email

New applications, decisions and site starts in Blackrock, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options