Site start · Co. Dublin

Dublin 22, Dublin

Granted 16 May 2022 (final grant issued 19 Jul 2022)

Key facts

  • Site start record SD21A/0241 at Dublin 22, Co. Dublin: Demolition of the abandoned single storey dwelling and associated…
  • The planning authority is South Dublin County Council.
  • Status: Granted 16 May 2022 (final grant issued 19 Jul 2022).

Source: the South Dublin County Council planning register, as last seen on 12 Jul 2026. Open the council's file

More planning applications in Dublin 22 · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 16 May 2022.

Application details as we last saw them in the national register on 12 Jul 2026.

What and where

Demolition of the abandoned single storey dwelling and associated…

Demolition of the abandoned single storey dwelling and associated outbuilding (206 m²); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.

Location
Dublin 22, Co. Dublin Map
Planning reference
SD21A/0241
Application type
Commencement Notice
Owner named on the notice
Vantage DATA Centers Ireland Ltd

Numbers and dates

Floor area
40,589 m²
Project type
Infrastructure
Received
21 Mar 2022
Decision to grant
16 May 2022
Final grant
19 Jul 2022
Site start notified
20 Apr 2023

Documents and evidence

Check the record

How we know this

From the South Dublin County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 20 Apr 2023Notice filed · phase 1 · It is proposed to construct two new two-storey digital data facilities in Grangecastle...Notice re-filed 26 Jul 2023 for the same works.View the site start
  2. 4 Aug 2023Notice filed · phase 2 · The MFGP North building is a two storey building used for the production of power for...View the site start
  3. 4 Aug 2023Notice filed · phase 3 · The MFGP South building is a two storey building used for the production of power for...View the site start
  4. 30 Dec 2024Notice filed · phase 4 · The project will consist of the construction of 3 modular building to house 20 kV...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 22

Get alerts for Dublin 22Free. We email you when new applications appear.

Free email alerts

Get new Dublin 22 projects by email

New applications, decisions and site starts in Dublin 22, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options