Site start

Housing site start — Profile Park

Dublin 22, Dublin

5 commencement notices · latest start date 30 Dec 2024 · planning reference given

Planning SD21A/0241 · Planning application · Council file · external

View full project timeline

Commencement notices
5
Latest start date
30 Dec 2024
Latest notice
199 m²
Planning reference
SD21A/0241
Location
Dublin 22, Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
2
Completion certificates
0

Exact appeal 313787 · Appeal withdrawn S.140(1)(a) · 2022-07-04 · Open official case

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Dublin 22, Dublin
County
Dublin

Addresses on the notices

  • ground level, bunded fuel tanks at basement level and admin area and associated swithc rooms at first floor level
  • ground level, bunded fuel tanks at basement level and associated switch rooms at first floor level
  • roof level
  • Profile Park, Dublin
Location evidence needs care
  • Notice source points are up to 213.6 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 51.892080, -8.553600 Open point
  • Public notice source · 53.317980, -6.432838 Open point
  • Public notice source · 53.317980, -6.432838 Open point
  • Public notice source · 53.317689, -6.440683 Open point
  • Public notice source · 53.317735, -6.440991 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD21A/0241. South Dublin County Council Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The project will consist of the construction of 3 modular building to house 20 kV switchgear for datacentre load and export distribution.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 199 m².

Planning reference SD21A/0241 Developer stated: Vantage DATA Centers Ireland Ltd
Notice 2 Seven-day notice

The MFGP North building is a two storey building used for the production of power for the development. The building consists of an engine room at ground level, bunded fuel tanks at basement level and admin area and associated swithc rooms at first floor level.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 4,308 m².

Planning reference SD21A/0241
Notice 3 Seven-day notice

The MFGP South building is a two storey building used for the production of power for the development. The building consists of an engine room at ground level, bunded fuel tanks at basement level and associated switch rooms at first floor level.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 3,075 m².

Planning reference SD21A/0241
Notice 4 Seven-day notice

It is proposed to construct two new two-storey digital data facilities in Grangecastle. Building 12 will contain mechanical/electrical equipment as well as ancillary office/storage accommodation. The building will be two storeys, with plant facilities at roof level. The building will have a relatively low occupancy largely consisting of technicians and security personnel.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 12,744 m².

Planning reference SD21A/0241
Notice 5 Commencement notice

It is proposed to construct two new two-storey digital data facilities in Grangecastle. Building 11.1 will contain mechanical/electrical equipment as well as ancillary office/storage accommodation. The building will be two storeys, with plant facilities at roof level. The building will have a relatively low occupancy largely consisting of technicians and security personnel. Building 11.2 will be a shell & core only. A future Revised Fire Safety Certificate will be submitted for a fit out of Dub 11.2 at a later date.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 49,334 m².

Planning reference SD21A/0241

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.