South Dublin County Council / SD25A/0298W

Commercial new build, Site within Mountpark Grange Castle West, Gollierstown... - Planning Application SD25A/0298W

The proposals will comprise of amendments to Unit 7 (K78 V6TY) constructed under Reg. Ref.: SD23A/0301 (as amended by Reg. Ref.: SD24A/0224W and...

Development Description

The proposals will comprise of amendments to Unit 7 (K78 V6TY) constructed under Reg. Ref.: SD23A/0301 (as amended by Reg. Ref.: SD24A/0224W and SD25A/0011W). The proposed amendments will consist of: • Change of use from logistics/warehousing to logistics/warehousing/light - industry to accommodate a manufacturing use; • Reconfiguration of the layout of the unit resulting a slight increase in the total GFA from 12,650 sqm to 13,333 sqm. The warehouse floor area of the unit will decrease from 11,509 sqm GFA to 10,652 sqm of manufacturing floor area for the new use and the associated office space will increase from 994 sqm to 2,518 sqm; • Amendments to the elevations to accommodate the changes to the layout of the unit; • Provision of a canopy at the entrance of the building on the southern elevation and a new outdoor terrace (c. 110 sqm) to the south of the unit; • Reconfiguration of the car parking spaces to the south of the unit and provision of a new overflow car parking area to the west of the service yard; • A total of 213 no. car parking space will be provided to serve the development; • New entrance to overflow car park from internal link road to the south; • Provision of 10 no. van spaces to the south west corner of the service yard; • Installation of a containerised generator within the service yard area; • Provision of new tenant signage on south elevation: • Relocation of existing signage on the south elevation to the east elevation; • Provision of carpark totem to overflow parking; • Provision of additional PV panels at roof level and; • All associated site development works and landscaping works

Commercial new buildEnergyFire / FSC likelyH&S triggerVacant / reuse signal

Map

No coordinates supplied in the public planning feed.

Same county

Related leads nearby

5 records
Fingal County Council / FW26A/0118E / 2026-05-18

Unit 2, Coolport, Porters Road, Coolmine Industrial Estate, Dublin 15,

Retention for change of use of existing industrial unit to retail unit

Stage
Granted
Value band
Unknown - verify
Applicant
not yet scraped
Units / floor
units unknown / floor unknown
Useful for
ElectricalFire SafetyFit-outMain contractorMechanical
Agent
not yet scraped
Commercial new buildFire / FSC likelyVacant / reuse signal
Fingal County Council / ABP-313583-22 / 2026-06-02

Fingal, Dublin

Construction of a 3 Storey 7 Hall data centre. The building contains ancillary offices at the ground floor to the west of the building at North Road, Finglas, Dublin 11.

Stage
Commencement
Value band
Unknown - verify
Applicant
not yet scraped
Units / floor
units unknown / floor unknown
Useful for
ComplianceElectricalFire SafetyFit-outHealth & Safety
Agent
Winthrop Technologies Ltd
Commercial new buildFire / FSC likelyH&S triggerGoing to site
Lead page
Fingal County Council / FW24A/0530E / 2026-05-28

Fingal, Dublin

permission for a commercial development consisting of the following;

Stage
Commencement
Value band
Unknown - verify
Applicant
Goats Gruff Ltd
Units / floor
units unknown / floor unknown
Useful for
ElectricalFire SafetyFit-outMain contractorMechanical
Agent
FJB Construction LTD
Commercial new buildFire / FSC likelyGoing to sitesource=commencement
Fingal County Council / CN0142001FL / 2026-05-11

Fingal, Dublin

Minor internal works to existing retail unit in retail park.

Stage
Commencement
Value band
Unknown - verify
Applicant
Next Retail Ltd
Units / floor
units unknown / floor unknown
Useful for
ElectricalFire SafetyFit-outMain contractorMechanical
Agent
Mascott Construction Europe) Ltd
Commercial new buildFire / FSC likelyGoing to sitesource=commencement
Lead page
Dún-Laoghaire Rathdown County Council / CN0141795DR / 2026-05-11

Dunlaoghaire Rathdown, Dublin

The proposed development consists of the relocation of the existing Office Room and Defects Room, currently located on the north side of the Production Area on the ground floor of the PM3 Building, into an empty area located in the centre of the Production ...

Stage
Commencement
Value band
Unknown - verify
Applicant
not yet scraped
Units / floor
units unknown / floor unknown
Useful for
ElectricalFire SafetyFit-outMain contractorMechanical
Agent
Mick Thomas Construction Ltd
Commercial new buildFire / FSC likelyGoing to sitesource=commencement
Lead page