Large residential · Co. Dublin
Tandy's Lane, In the townlands of Doddsborough and Finnstown, Adamstown, Lucan, Co. Dublin
Granted 28 Sep 2022
Since you last looked
Worked out in this browser from the record's own dates. We do not send emails about it.
Council register
The council's register shows: Granted on 28 Sep 2022.
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
352 homes
Construction of 352 residential units (terraced, semidetached and detached) comprising 253 two storey houses (15 two bed units and 238 three bed units ranging in size from c. 86sq.m to c. 118sq.m) and 99 three storey houses (18 three bed units and 81 four bed units and ranging in size from c. 147sq.m to c. 189sq.m); The total gross floor area of the development is c. 43,272sq.m; The development will also comprise the provision of 2 vehicular accesses from Adamstown Boulevard, 1 vehicular access from Adamstown Drive (L1030), 2 vehicular accesses from Adamstown Park Road and 2 vehicular accesses from Tandy's Lane; vehicular connections will also be provided to permitted roads in Tandy's Lane Phase 1; internal routes; 535 car parking spaces including on-curtilage and off-curtilage spaces; bicycle parking; bin storage; plant; ESB Substations; boundary treatments; lighting; hard and soft landscaping; and all other associated site works; on 2 No. sites separated by the permitted Tandy's Lane Phase 1 Development (SDCC Reg. Ref. SDZ19A/0011) with a total site area of c. 10.24 hectares at Tandy's Lane, in the townlands of Doddsborough and Finnstown, Adamstown, Lucan, Co. Dublin. The western site (8.06 hectares) is generally bounded to the west by Adamstown Boulevard, to the north by Adamstown Drive (L1030), to the east by the Tandy's Lane Phase 1 Development which is currently under construction (SDCC Reg. Ref. SDZ19A/0011) and undeveloped lands, and to the south by Tandy's Lane which links Adamstown Boulevard with Adamstown Park Road. The eastern site (2.18 hectares) is generally bounded to the west / north-west by the permitted Tandy's Lane Phase 1 Development, to the east by Adamstown Park Road and to the south by Tandy's Lane; This application is being made in accordance with the Adamstown Planning Scheme 20141 (as amended) and relates to a proposed development within the Adamstown Strategic Development Zone Planning Scheme. The lands are located within the Tandy's Lane Village Development Area.
- Location
- Lucan, Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SDZ22A/0006
Key facts
- Homes
- 352
- Floor area
- 43,272 m²
- Estimated construction value
- €75m to €96mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Large residential
- Received
- 1 Sep 2022
- Granted
- 28 Sep 2022
- Site start
- 18 Apr 2023
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file SDZ22A/0006 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 18 Apr 2023Work started · phase 1 · Construction of 193 residential units (Terraced, semi-detached and detached) Comprising...
- 12 Apr 2024Work started · phase 2 · Construction of 30 residential units (Terraced and semi- detached) Comprising of 17 two...
- 12 Apr 2024Work started · phase 3 · Construction of 37 residential units (Terraced, semi- detached and detached) Comprising...
- 12 Apr 2024Work started · phase 4 · Construction of 49 residential units (Terraced and semi- detached) Comprising of 35 two...
- 12 Apr 2024Work started · phase 5 · This phase of the proposed development consists of 6no. Residential Units located in a...
- 12 Apr 2024Work started · phase 6 · Construction of 10 residential units (Terraced, semi- detached and detached) Comprising...
- 12 Apr 2024Work started · phase 7 · This phase of the proposed development consists of 16 no. Residential Units located in a...
- Completion certificate recordedRecorded in Apr 2023 · 10 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 3 Oct 2026.
- Completion certificate recordedRecorded in Apr 2023 · 14 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 3 Oct 2026.
- Completion certificate recordedRecorded in Apr 2023 · 9 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 3 Oct 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.