Cairn Homes Properties Limited intend to apply for a 7 year planning…
Cairn Homes Properties Limited intend to apply for a 7 year planning permission for development at a site of c.15.6 hectares (on two land parcels) known as 'Development Area 9' Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. The site is principally bounded by the Dublin-Cork railway line to the north, the Grand Canal to the south, the Grange Castle Road (R136) to the south-west and undeveloped lands to the north-west and east. The development will consist of the construction of a mixed-use development, which includes 660 no. residential units comprising: • 264 no. semi-detached and terraced houses (7 No. 2 bed 4 person houses, 238 No. 3 bed houses and 19 No. 4 bed houses), ranging in height from 2 to 3 storeys. • 68 No. duplex apartment units (34 no. 2 bed 4 person units and 34 no. 3 bed units), arranged across 6 No. duplex blocks, ranging in height from 2 to 3 storeys; • 328 no. apartments (165 no. 1 bed units, 30 no. 2 bed 3 person units, 133 no. 2 bed 4 person units), arranged across 7 No. apartment blocks (Blocks 1, 2, 3, 4, 5a, 5b and 5c), ranging in height from 4 to 6 storeys; and • A creche (c. 615 sq m) at ground floor level within Block 4. The development will also include a Local Node at 'Clonburris Little' which includes the provision of a double-height Park Hub building (c. 8m in height) comprising c. 1,558 sq m of community floorspace, including a sports hall/place of assembly, multi-purpose spaces, changing rooms, a café, storage areas, staff and visitor amenity areas and other ancillary spaces. Vehicular access to the site will be from the Clonburris Southern Link Street (as permitted by Reg. Ref. SDZ20A/0021) located centrally between Sub-Sectors KSE-S1 and KSE-S2. The development will also consist of the provision of c.11,049 sq m of public open spaces and associated landscaping (including a section of Grand Canal Park, a local park and pockets parks); communal open spaces; private open space (rear gardens, terraces and balconies); hard and soft landscaping (including internal roads, pedestrian and cyclist routes, pathways, hedgerows, boundary treatments and street furniture); play spaces with natural play elements; surface car parking (653 no. surface spaces in total, including accessible spaces); electric vehicle charging points; bicycle parking (long and short stay spaces including stands) and electric bicycle charging points; motorcycle parking; pedestrian and cyclist connections; routes ESB substations, piped infrastructural services and connections; ducting; plant; waste management provision; SuDS measures (including brown roofs/biodiverse roofs, ponds and wetland areas); solar panels; advertising signage; pedestrian crossings, public lighting; changes in levels and all site development and excavation works above and below ground.
- Location
- Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SDZ24A/0029W
- Applicant
- Cairn Homes Properties Ltd
- Agent
- Cairn Homes Construction Ltd
- Builder
- Cairn Homes Construction Ltd
Key facts
- Floor area
- 28,889 m²
- Project type
- Infrastructure
- Site start
- 6 Nov 2025
Documents and evidence
Check the record
- Council planning fileThe application file SDZ24A/0029W on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, as last seen on 10 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 6 Nov 2025Work started · phase 1 · Construction of 132 Housing units, and associated ancillary worksNotice re-filed 28 May 2026 for the same works.
- 18 Mar 2026Work started · phase 2 · Construction of 6 no. Duplex blocks, consisting of 68 no. units, and associated...
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.