Protected structure · Co. Dublin
38 Leeson Street Upper, Ranelagh, Dublin 4
Granted 23 Jun 2025
Key facts
- Planning application WEB1957/25 at 38 Leeson Street Upper, Ranelagh, Dublin 4: PROTECTED STRUCTURE.
- It was received by Dublin City Council on 2 May 2025.
- Status: Granted 23 Jun 2025.
- Work started on site on 8 Dec 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, checked 2 Jun 2026. Search the council's register
More planning applications in Dublin 4 · Planning applications in Co. Dublin
Since you last looked
Worked out in this browser from the record's own dates. We do not send emails about it.
What and where
PROTECTED STRUCTURE
PROTECTED STRUCTURE: Siobhan Dillon & Michael Hale are applying for planning permission for A) single-storey 16.5 m² extension at lower ground floor level to the side of an existing non-original extension to the south-west (rear) return; B) alterations to the south-west (rear) elevation of the existing non-original extension to the south-west (rear) return; C) alterations to the existing internal layout, including the provision at lower ground floor level of a new open plan kitchen, living & dining area, a utility room and at second floor level the provision of a new walk in wardrobe & ensuite; D) the reinstating of the stairs connecting ground & first floor; E) the provision of two new skylights on the inner pitches of the original ridged roof; F) repairs to the existing original timber sash windows in the North-East (front) and South-West (rear) Elevation, and G) the cleaning & re-pointing of the brick in the North-East (front) elevation. All at 38 Leeson Street Upper, Ranelagh, Dublin 4, D04 X5P6 (protected structure ref. 4493).
- Location
- Dublin 4, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- WEB1957/25
Numbers and dates
- Floor area
- 16 m²
- Project type
- Protected structure
- Received
- 2 May 2025
- Granted
- 23 Jun 2025
- Site start
- 8 Dec 2025
- Protected structure
- Yes
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference WEB1957/25.Search the register
How we know this
From the Dublin City Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.
Site starts
Commencement notices for this permission
- 8 Dec 2025Work started · Single-storey extension at lower ground floor to the side of an existing rear extension...
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.