Save to pipeline

Protected structure · Co. Dublin

4. The development shall comply with the following requirements of…, Co. Dublin

Decision due 3 Nov 2026

What and where

4. The development shall comply with the following requirements of…

4. The development shall comply with the following requirements of the Conservation Section: b) In advance of the respective associated work packages commencing on site, the applicant shall submit the following to the Planning Authority, for their written agreement: i) Item 4 Portion of existing wall retained: Submit detailed description of the proposed consolidation, repointing and conservation repairs to the projecting wall remnant on New Row including Conservation Architect’s detailed methodology, specification for repointing, and 1:20 elevation drawings of the front back and side of the wall remnant. ii) Item 5 Existing windows to be lowered at 2nd and 3rd floor levels: The lowering of the cills shall be omitted (refer to CO report). The Applicant to submit 1:20 corrected elevation and section details through each of the bays retaining and repairing the existing wall fabric and window arrangements, where possible. The drawings shall indicate if the existing cills are natural stone, which should be retained and reinstated if they are sound, and replaced on a like-by-like basis if they are in poor condition. iii) Item 6 Retention of section of existing wall to be taken down and re-built: Submit Good-quality record photographs of the front and rear of the wall, prior to its dismantling, and photographs of where the wall fabric is stored pending reinstatement, and a detailed drawing and methodology of how the wall materials will be reconstructed and tied into the retained historic wall and new construction iv) Item 8 Metal coping to be installed instead of stone coping to parapet (former eaves) of Protected Structure: Submit 1:5 comparative details of a) the existing projecting brick detail at the top of the wall, b) a natural stone capping on top of the retained projecting brickwork, and

Location
Co. Dublin Map
Planning reference
WEB2302/26Sub01
Applicant
TC Fumbally Properties Ltd

Key facts

Project type
Protected structure
Received
9 Sep 2026
Decision due
3 Nov 2026
Protected structure
Yes

Outlook

What happens next

The council's decision is due on 3 Nov 2026. Building work can only follow a grant of permission.

Work packages named so far

  • Conservation work to a protected structureNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file WEB2302/26Sub01 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Dublin City Council planning register, checked 29 Sep 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Co. Dublin

Get alerts for Co. DublinFree. We email you when new applications appear.

Free email alerts

Get new Dublin projects by email

New planning applications, decisions and site starts in Co. Dublin. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options