Protected structure, No. 1 Essex Street East, Dollard House, Nos. 2-5 Essex...
PROTECTED STRUCTURE: Keywell DAC intends to apply for Permission at this site (c.0.17 ha) at No. 1 Essex Street East, Dollard House, Nos. 2-5 Essex Street East and Nos. 2-5 Wellington Quay (Protected Structure), The Clarence Hotel, Nos. 6-8 Wellington Quay and Nos. 6-8 Essex Street East (Protected Structure) and Anne's Bar...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 30 Apr 2025. / Confidence: LowDecision date 30 Apr 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
PROTECTED STRUCTURE: Keywell DAC intends to apply for Permission at this site (c.0.17 ha) at No. 1 Essex Street East, Dollard House, Nos. 2-5 Essex Street East and Nos. 2-5 Wellington Quay (Protected Structure), The Clarence Hotel, Nos. 6-8 Wellington Quay and Nos. 6-8 Essex Street East (Protected Structure) and Anne's Bar, No. 8 Essex Street East, Temple Bar, Dublin 2. For development comprising proposed hotel refurbishment, conservation and alteration (c.8,544 sq m gfa total), and vertical roof and infill...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- WEB2671/24
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
PROTECTED STRUCTURE: Keywell DAC intends to apply for Permission at this site (c.0.17 ha) at No. 1 Essex Street East, Dollard House, Nos. 2-5 Essex Street East and Nos. 2-5 Wellington Quay (Protected Structure), The Clarence Hotel, Nos. 6-8 Wellington Quay and Nos. 6-8 Essex Street East (Protected Structure) and Anne's Bar, No. 8 Essex Street East, Temple Bar, Dublin 2. For development comprising proposed hotel refurbishment, conservation and alteration (c.8,544 sq m gfa total), and vertical roof and infill building extension (c.841 sq m gfa total), to accommodate the addition of 104no. new hotel keys (resulting in 162no. total existing and proposed) and ancillary hotel amenities including retail-bakery, licenced restaurants, bars and event spaces, as follows: - Clarence Hotel: Removal of existing Clarence dormer roof (L04) and plant room (L06) and addition of 1-storey dormer extension (c.256 m², L05) above No.6-8 Essex Street East (southern) elevation and Clarence Hotel east elevation, and alteration (subdivision) and refurbishment of Levels 01 to 06 inclusive, to accommodate 37no. additional hotel keys. Ancillary hotel lounge bar/reception area (c.177 sq m), refurbished Octagon Bar (c.78 sq m) and Stout Bar (c.45 sq m) and contemporary music bar (c.133 sq m) at ground floor (L00), and hotel gym (c.88 m²) and live music venue (c. 269 sq m) at basement level. - Dollard House: Change of use of existing upper floors, from L01 to L04 inclusive, to accommodate 46no. hotel keys; change of ground floor (L00) to use as ancillary restaurant (c.232 sq m), retail bakery-coffee shop (c.96 m²) and associated kitchen and back-of-house facilities; and new event and banqueting space (c.320 sq m total) at L01. Removal of existing eastern wing dormer roof (L04) at Dollard House and replacement with 1-storey dormer extension (c.95 sq m) to accommodate 2no. new hotel keys (L05) at eastern interface with Clarence Hotel. - No.1 Essex Street East: Change of use of existing upper floors, from L01 to L03 inclusive, to accommodate 3no. hotel keys, and removal of existing roof structure (L04) and addition of 2-storey dormer extension (c.69 sq m) to accommodate 1no. hotel key (duplex, L04-L05), above No.1 Essex Street East. - Anne's Bar, No.8 Essex Street East: Demolition of existing Anne's Bar (c.214 sq m gfa) and construction of a new 6-storey hotel extension (c.635 sq m), to accommodate 15no. hotel keys (L01-L05), replacement licenced bar (c.44 sq m) at ground floor (L00) and back of house facilities at mezzanine level, at No.8 Essex Street East. And all associated and ancillary alteration, refurbishment, repair, conservation, restoration and fit out works, including: Internal reconfiguration works at the Clarence Hotel and Dollard House, including: the reconfiguration of floor plans, partial demolition of load-bearing and non-load bearing walls and partitions, partial stripping back of non-original finishes and features across all floors to both buildings; integration of new services, structural strengthening works and creation of new circulation and service connections through existing walls and floors between all buildings including Dollard House, Clarence Hotel, No.1 Essex Street East and No.8 Essex Street East. Fire resistant lining and enclosure of existing roof timbers and structure of existing Dollard roof. Alterations to the existing Wellington Quay (north) façade to include: replacement of existing fire escape door to reinstate a new window to match existing historic windows at the Clarence at 6-8 Wellington Quay, integration of new wall vents, and replacement of existing service entrance with an additional hotel entrance at Dollard House at 2-5 Wellington Quay. 2no. new dormer roof windows to the north elevation and new windows to east and south elevations at L06 of the Clarence Hotel. Relocation of external plant space to roof (c.90 sq m, L07) and associated external access stairs at the Clarence Hotel. Location of external plant to roof (c.28 sq m, L02) and associated screen to Dollard courtyard. Extension and recladding of 2no. existing ventilation ducts at Clarence east elevation. Replacement and extension of external fire stairs at Clarence roof level (L05-L06). Modification of existing entrance door to form escape route at ground floor of No.1 Essex Street East. Repairs to existing roof fabric including; valleys, gutters, linings, structural timbers, existing dormers, rainwater goods and chimneys and provision of thermal upgrades at both Clarence and Dollard House. Replacement of Dollard House existing upper floor windows on Wellington Quay facade and existing aluminium windows on courtyard and upper floors of East Essex Street façade, with double-glazed windows to match existing. Restoration of existing ground floor windows to the north elevation of The Clarence Hotel, at 6-8 Wellington Quay, to reinstate lead came detailing. Modification of existing finishes to the southern elevation of The Clarence Hotel at L03. Addition of new wall vents to the southern elevation of The Clarence Hotel to match existing. Reconsolidation works post integration of structural and service interventions.
Application to site progress
-
Applied 6 Dec 2024 WEB2671/24
-
Decision Grant Permission 30 Apr 2025
-
Appeal Appeal withdrawn S.140(1)(a) 322606 / 11 Jun 2025
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB2671/24
PROTECTED STRUCTURE: Keywell DAC intends to apply for Permission at this site (c.0.17 ha) at No. 1 Essex Street East, Dollard House, Nos. 2-5 Essex Street East and Nos. 2-5 Wellington Quay (Protected Structure), The Clarence Hotel, Nos. 6-8 Wellington Quay and Nos. 6-8 Essex Street East (Protected Structure) and Anne's Bar, No. 8 Essex Street East, Temple Bar, Dublin 2. For development comprising proposed hotel refurbishment, conservation and alteration (c.8,544 sq m gfa total), and vertical roof and infill building extension (c.841 sq m gfa total), to accommodate the addition of 104no. new hotel keys (resulting in 162no. total existing and proposed) and ancillary hotel amenities including retail-bakery, licenced restaurants, bars and event spaces, as follows: - Clarence Hotel: Removal of existing Clarence dormer roof (L04) and plant room (L06) and addition of 1-storey dormer extension (c.256 m², L05) above No.6-8 Essex Street East (southern) elevation and Clarence Hotel east elevation, and alteration (subdivision) and refurbishment of Levels 01 to 06 inclusive, to accommodate 37no. additional hotel keys. Ancillary hotel lounge bar/reception area (c.177 sq m), refurbished Octagon Bar (c.78 sq m) and Stout Bar (c.45 sq m) and contemporary music bar (c.133 sq m) at ground floor (L00), and hotel gym (c.88 m²) and live music venue (c. 269 sq m) at basement level. - Dollard House: Change of use of existing upper floors, from L01 to L04 inclusive, to accommodate 46no. hotel keys; change of ground floor (L00) to use as ancillary restaurant (c.232 sq m), retail bakery-coffee shop (c.96 m²) and associated kitchen and back-of-house facilities; and new event and banqueting space (c.320 sq m total) at L01. Removal of existing eastern wing dormer roof (L04) at Dollard House and replacement with 1-storey dormer extension (c.95 sq m) to accommodate 2no. new hotel keys (L05) at eastern interface with Clarence Hotel. - No.1 Essex Street East: Change of use of existing upper floors, from L01 to L03 inclusive, to accommodate 3no. hotel keys, and removal of existing roof structure (L04) and addition of 2-storey dormer extension (c.69 sq m) to accommodate 1no. hotel key (duplex, L04-L05), above No.1 Essex Street East. - Anne's Bar, No.8 Essex Street East: Demolition of existing Anne's Bar (c.214 sq m gfa) and construction of a new 6-storey hotel extension (c.635 sq m), to accommodate 15no. hotel keys (L01-L05), replacement licenced bar (c.44 sq m) at ground floor (L00) and back of house facilities at mezzanine level, at No.8 Essex Street East. And all associated and ancillary alteration, refurbishment, repair, conservation, restoration and fit out works, including: Internal reconfiguration works at the Clarence Hotel and Dollard House, including: the reconfiguration of floor plans, partial demolition of load-bearing and non-load bearing walls and partitions, partial stripping back of non-original finishes and features across all floors to both buildings; integration of new services, structural strengthening works and creation of new circulation and service connections through existing walls and floors between all buildings including Dollard House, Clarence Hotel, No.1 Essex Street East and No.8 Essex Street East. Fire resistant lining and enclosure of existing roof timbers and structure of existing Dollard roof. Alterations to the existing Wellington Quay (north) façade to include: replacement of existing fire escape door to reinstate a new window to match existing historic windows at the Clarence at 6-8 Wellington Quay, integration of new wall vents, and replacement of existing service entrance with an additional hotel entrance at Dollard House at 2-5 Wellington Quay. 2no. new dormer roof windows to the north elevation and new windows to east and south elevations at L06 of the Clarence Hotel. Relocation of external plant space to roof (c.90 sq m, L07) and associated external access stairs at the Clarence Hotel. Location of external plant to roof (c.28 sq m, L02) and associated screen to Dollard courtyard. Extension and recladding of 2no. existing ventilation ducts at Clarence east elevation. Replacement and extension of external fire stairs at Clarence roof level (L05-L06). Modification of existing entrance door to form escape route at ground floor of No.1 Essex Street East. Repairs to existing roof fabric including; valleys, gutters, linings, structural timbers, existing dormers, rainwater goods and chimneys and provision of thermal upgrades at both Clarence and Dollard House. Replacement of Dollard House existing upper floor windows on Wellington Quay facade and existing aluminium windows on courtyard and upper floors of East Essex Street façade, with double-glazed windows to match existing. Restoration of existing ground floor windows to the north elevation of The Clarence Hotel, at 6-8 Wellington Quay, to reinstate lead came detailing. Modification of existing finishes to the southern elevation of The Clarence Hotel at L03. Addition of new wall vents to the southern elevation of The Clarence Hotel to match existing. Reconsolidation works post integration of structural and service interventions.
Open official record