Temporary/event · Co. Dublin
11, Jamestown Road, Finglas North, Dublin 11, D11 H678
Decision due 29 Oct 2026
Key facts
- Planning application WEB2701/24Sub07 at 11, Jamestown Road, Finglas North, Dublin 11, D11 H678: The following requirements of the City Archaeologist shall be…
- The applicant is Brendan Smartt. The agent is Michelle Gaughan.
- It was received by Dublin City Council on 4 Sep 2026.
- Status: Decision due 29 Oct 2026.
- The council's decision is due on 29 Oct 2026. Building work can only follow a grant of permission.
Source: the Dublin City Council planning register, checked 28 Sep 2026. Open the council's file
More planning applications in Dublin 11 · Planning applications in Co. Dublin
Since you last looked
Worked out in this browser from the record's own dates. We do not send emails about it.
What and where
7. The following requirements of the City Archaeologist shall be…
7. The following requirements of the City Archaeologist shall be complied with: a) No construction or site preparation work may be carried out on the site until all archaeological requirements of the Planning Authority are complied with. b) The project shall have an archaeological assessment (and impact assessment) of the proposed development, including all temporary and enabling works, geotechnical investigations, e.g. boreholes, engineering test pits, etc. carried out for this site as soon as possible and before any site clearance/construction work commences. The assessment shall be prepared by a suitably qualified archaeologist and shall address the following issues. i. The archaeological and historical background of the site, to include industrial heritage. ii. A paper record (written, drawn, and photographic, as appropriate) of any historic buildings and boundary treatments, etc. iii. The nature, extent and location of archaeological material on site by way of archaeological testing. iv. The impact of the proposed development on such archaeological material. c) The archaeologist shall forward their Method Statement in advance to the Planning Authority for written agreement. d) Where archaeological material is shown to be present, a detailed Impact Statement shall be prepared by the archaeologist which will include specific information on the location, form, size and level (corrected to Ordnance Datum) of all foundation structures, ground beams, floor slabs, trenches for services, drains etc. The assessment shall be prepared on the basis of a comprehensive desktop study and, where appropriate/feasible, trial trenches excavated on the site by the archaeologist and/or remote sensing. The trial trenches shall be excavated to the top of the archaeological deposits only. The report containing the assessment shall include adequate ground-plan and cross-sectional drawings of the site, and of the proposed development, with the location and levels (corrected to Ordnance Datum) of all trial trenches and/or bore holes clearly indicated. A comprehensive mitigation strategy shall be prepared by the consultant archaeologist and included in the archaeological assessment report. e) No subsurface work shall be undertaken in the absence of the archaeologist without his/her express consent. The archaeologist retained by the project to carry out the assessment shall consult with the Planning Authority in advance regarding the procedure to be adopted in the assessment. f) A report containing the results of the archaeological assessment shall be forwarded on completion to the Planning Authority for written agreement. The Planning Authority (in consultation with the City Archaeologist and the National Monuments Service, Dept. of Housing, Local Government and Heritage, shall determine the further archaeological resolution of the site to be agreed in writing. g) The developer shall comply in full with any further archaeological requirement, including archaeological monitoring, and if necessary archaeological excavation and/or the preservation in situ of archaeological remains, which may negate the facilitation of all, or part of any basement. h) The developer shall make provision for archaeological excavation in the project budget and timetable. i. A bi weekly report on the archaeological excavation during the excavation and post excavation period. ii. A preliminary report on the archaeological excavation not later than four weeks after the completion of the excavation. iii. A final report on the archaeological excavations not later than twelve months after the completion of the excavation j) Before any site works commence the developer shall agree the foundation layout with the Planning Authority. k) Following submission of the final report to the Planning Authority, where archaeological material is shown to be present the archaeological paper archive shall be compiled in accordance with the procedures detailed in the Dublin City Archaeological Archive Guidelines (2008 Dublin City Council), and lodged with the Dublin City Library and Archive, 138-144 Pearse Street, Dublin 2.
- Location
- Dublin 11, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- WEB2701/24Sub07
- Applicant
- Brendan Smartt
- Agent
- Michelle Gaughan
Numbers and dates
- Project type
- Temporary/event
- Received
- 4 Sep 2026
- Decision due
- 29 Oct 2026
Site history
This site's history
-
Application WEB2701/24Sub04 at the same address: received 4 Sep 2026, no decision recorded yet.
6. The following requirements of the Transportation Planning Division shall be complied with: b. Prior to commencement of development, and… Same address -
Application WEB2701/24Sub03 at the same address: received 4 Sep 2026, no decision recorded yet.
6. The following requirements of the Transportation Planning Division shall be complied with: a. Prior to commencement of development along… Same address -
Application WEB2701/24Sub01 at the same address: received 4 Sep 2026, no decision recorded yet.
4. Following commissioning of the development a compliance noise survey as detailed in the Noise Impact Assessment (prepared by Malone… Same address -
Application WEB2701/24Sub02 at the same address: received 4 Sep 2026, no decision recorded yet.
5. The following requirements of the Engineering Department (Drainage Division) shall be complied with: b. A connection from this… Same address -
Application WEB2701/24Sub08 at the same address: received 4 Sep 2026, no decision recorded yet.
8. The applicant shall comply with the following Environmental Health requirements; a. The Construction Management Plan should be revised… Same address -
Application WEB2701/24Sub06 at the same address: received 4 Sep 2026, no decision recorded yet.
6. The following requirements of the Transportation Planning Division shall be complied with: d. The applicant should address the following… Same address -
Application WEB2701/24Sub05 at the same address: received 4 Sep 2026, no decision recorded yet.
6. The following requirements of the Transportation Planning Division shall be complied with: c. Prior to commencement of development, and… Same address
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file WEB2701/24Sub07 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Dublin City Council planning register, checked 28 Sep 2026. We link to the council's own file so you can check the official record before you act.
Explore the area