Protected structure · Co. Dublin
St Patrick’s Cathedral, St Patrick's Close, Dublin, Dublin 8, D08 H6X3
Granted 2 Dec 2025 (final grant issued 14 Jan 2026)
Key facts
- Planning application WEB5360/25 at St Patrick’s Cathedral, St Patrick's Close, Dublin, Dublin 8, D08 H6X3: Works at St Patrick's Cathedral.
- It was received by Dublin City Council on 9 Oct 2025.
- Status: Granted 2 Dec 2025 (final grant issued 14 Jan 2026).
- Permission was granted on 2 Dec 2025 and the final grant issued on 14 Jan 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Dublin City Council planning register, checked 2 Jun 2026. Search the council's register
More planning applications in Dublin 8 · Planning applications in Co. Dublin
What and where
Works at St Patrick's Cathedral
PROTECTED STRUCTURE: We, the Board of St Patrick's Cathedral, intend to apply for permission for works at St Patrick's Cathedral, Minot Tower (Toilets), St. Patrick's Close, Dublin 8 (a protected structure RPS ref. no. 6443 & 6444 and a Recorded Monument DU018-020269). The works will include the following: 1. Removal of all partitions and toilet fittings/fixtures from the disabled WC and three-cubicle unisex toilets. 2. Removal of tiled floor finish and installation of a new stone floor finish. 3. Removal of plasterboard wall linings to expose the historic masonry on the north, east and west walls, which will be finished with limewash. 4. Enclosure of the staff canteen staircase with fire-resistant partitions and fire doors. 5. Installation of four self-contained cubicles, one cleaner's store and one accessible WC and changing area, all with new fittings and fixtures. 6. Removal of modern oak and glass door assembly. 7. Removal of two steps, or recent construction to expose bases of medieval doorway and facilitate Installation of a new compliant ramp to replace the existing non-compliant ramp. 8. All new foul drainage to be connected to existing drains that run under the concrete slab, under the suspended ground floor of the Minot Tower. 9. All new extract to connect into existing ducting in the existing riser in the NW corner, that will be reduced in size.
- Location
- Dublin 8, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- WEB5360/25
Numbers and dates
- Project type
- Protected structure
- Received
- 9 Oct 2025
- Decision to grant
- 2 Dec 2025
- Final grant
- 14 Jan 2026
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference WEB5360/25.Search the register
How we know this
From the Dublin City Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.