Site start · Co. Galway

Gort, Galway

Granted 7 May 2024 (final grant issued 17 Jun 2024)

Key facts

  • Site start record 2360437 at Gort, Co. Galway: Infrastructure works.
  • The planning authority is Galway County Council.
  • Status: Granted 7 May 2024 (final grant issued 17 Jun 2024).

Source: the Galway County Council planning register, as last seen on 10 Jun 2026. Open the council's file

More planning applications in Gort · Planning applications in Co. Galway

Council register

The council's register shows: Granted on 7 May 2024.

Application details as we last saw them in the national register on 10 Jun 2026.

What and where

Infrastructure works

Commencement Notice for development comprising 70 no. residential units on an application site area of 2.39ha approx. The development will consist of 5 No. 2-bedroom apartments; 10 No. 2-bedroom, duplex units; 13 No. 2-bedroom, terraced houses; 16 No. 3-bedroom, terraced houses; 8 No. 3-bedroom, semi-detached houses; 3 No. 4-bedroom, terraced houses; 12 No. 4-bedroom, semi-detached houses; 2 No. 5-bedroom, detached houses & 1 No. 6-bedroom, detached houses. Roof mounted solar PV panels on each house, panel orientation determined by the location of the house within the estate. 0.36ha of public open space including children’s play areas. 127 No. surface car parking spaces including; 74 No. residential parking spaces within private curtilage, 38 No. shared parking spaces, 3 No. visitors parking spaces, 4 No. disabled access compliant parking spaces and 9 No. electric vehicle charging spaces. 52 No. bicycle parking stands of which 24 are for public use. Vehicular access via a new priority-controlled T-junction on Ennis Road (R458) and ancillary tie-in arrangements to the public road. 1 no. ESB sub-station. 2 no. surface water attenuation tanks; foul drainage network including foul water pumping station and rising main with connection and discharge to public foul sewer at Ennis Road; connection to existing watermain on Ennis Road. Public lighting, boundary treatment, hard and soft landscaping and all ancillary site development works. The planning application is accompanied by a Natura Impact Statement

Description as published by the council. Its text starts part-way through a sentence.

Location
Gort, Co. Galway Map
Planning reference
2360437
Application type
Commencement Notice
Owner named on the notice
Limehill Esker Corbally Ltd
Agent named on the notice
Mardoc Developments

Numbers and dates

Project type
Infrastructure
Received
28 Apr 2023
Decision to grant
7 May 2024
Final grant
17 Jun 2024
Site start notified
10 Oct 2025

Site history

This site's history

  1. Site start under planning reference 2361429, about 20 m away: commencement notice filed for a start on 17 Nov 2025.

    Construction of Warehouse Unit No 2 and all associated services @ Ennis Rd, Gort About 20 m away
  2. Site start under planning reference 26/61332 at the same map point: commencement notice filed for a start on 13 Nov 2026.

    Construction of 1 no. block comprising 6 units numbered 4a,4b,4c and 5a,5b,5c at An Caiseal Phase , Ennis Rd, Gort no. two-storey… Same map point
  3. Site start under planning reference 171656, about 30 m away: commencement notice filed for a start on 27 Apr 2018.

    1. Proposed change of layout to new extension at rear of dwelling (44.5sqm) Previously granted under Planning Ref: 17/771, and, 2. All… About 30 m away

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Documents and evidence

Check the record

  • Council planning fileThe application file 2360437 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Galway County Council planning register, as last seen on 10 Jun 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 10 Oct 2025Notice filed · phase 1 · Construction of 47 no. two and three storey houses...View the site start
  2. 4 Feb 2026Notice filed · phase 2 · Construction of 6 no. Three Storey Duplex blocks containing 3 units per building and 18...View the site start
  3. 25 Mar 2026Notice filed · phase 3 · An Caiseal, Ennis Rd, Gort. Construction of 1 two storey house (No.3) along with...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Gort

Get alerts for GortFree. We email you when new applications appear.

Free email alerts

Get new Gort projects by email

New applications, decisions and site starts in Gort, Co. Galway. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options