Infrastructure · Co. Galway
Infrastructure works, Co. Galway
Granted on appeal 16 Jun 2025 (Decision to grant 10 Feb 2025 by the council)
We no longer update this application, so we can't email you about it. Get new planning applications in Co. Galway by email
Key facts
- Planning application 2460218 at Co. Galway: Infrastructure works.
- It was received by Galway City Council on 5 Jul 2024.
- Status: Granted on appeal 16 Jun 2025 (Decision to grant 10 Feb 2025 by the council).
- Work was due to start on 29 Dec 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Galway City Council planning register, as last seen on 2 Jun 2026. Open the council's file
Council register
The council's register shows: Decision to grant on 10 Feb 2025.
Search the Galway City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Infrastructure works
Bartra Property (Galway NH) Limited intend to apply for permission for development at this 0.531 Ha site previously comprising: a) the former O’Connor’s Warwick Hotel at the corner of Upper Salthill Road and the entrance to Lenaboy Park; b) No. 152 Upper Salthill Road (the former Oasis Nightclub); c) No. 154 Upper Salthill Road (former commercial building); and d) Nos. 156 & 158 Upper Salthill Road (semi-detached dwellings), all of which are now demolished. The site comprises part of a Protected Structure (RPS Ref. 9003, decorative cast-iron gates, railings and adjoining wall) at the entrance to Lenaboy Park at the north-eastern corner of the site. No works are proposed to the Protected Structure Works are also proposed on the R864 Upper Salthill Road and pavements south-east of the site boundary to include a raised pedestrian route at the entrance to the site, and all associated signage, road markings and services. A potable watermains pipe connection is also proposed to the existing Irish watermain pipe network on the R864 Upper Salthill Road. The site area, roadworks and water supply infrastructure will provide a total application site area of c. 0.5472 Ha. The development will principally consist of the construction of a part 4 to part 5 No. storey Nursing Home providing 154 No. bedrooms (157 No. bedspaces) and ancillary facilities (total gross floor area measures c. 8,217 sq m). The development will also include: the widening of the existing vehicular entrance; 30 No. car parking spaces (including 2 No. accessible spaces); bicycle parking; set-down area; loading bay; pedestrian access for emergency services at the south-eastern corner of the site from Upper Salthill Road; bin store; ESB sub-station, switch room and standby generator; PV panels; lift overrun; green roofs; fixed roof access ladder; lighting; roof plant; signage; balconies; boundary treatments; hard and soft landscaping; and all other associated site works above and below ground.
- Location
- Co. Galway Map
- Council
- Galway City Council
- Planning reference
- 2460218
Numbers and dates
- Floor area
- 8,217 m²
- Project type
- Infrastructure
- Received
- 5 Jul 2024
- Council decision
- 10 Feb 2025
- Appeal lodged
- 6 Mar 2025
- Granted on appeal
- 16 Jun 2025
- Site start notified
- 29 Dec 2025
- Protected structure
- Yes, RPS 9003
Timeline
- Application received
- Decision to grant by the council
- Appeal lodged
- Appeal decidedGrant permission with revised conditions
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2460218 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealGrant permission with revised conditions · 322029 / 16 Jun 2025View the appeal record
How we know this
From the Galway City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 29 Dec 2025Notice filed · The development consists of the construction of a 4 storey nursing home providing 131...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.