GrantedDecision recorded

Infrastructure, Ballydonagh Cloonineen Skecoor Kiltormer East and Graveshill...

Galway · Galway County Council · Plan 2561903 · PB ref PB-10000275330

for several minor amendments to the previously consented development under Planning Reference 2361049. The amendments comprise the following; re alignment of the main entrance and access gate; re alignment and widening of internal access tracks; alteration of the boundary fence; removal of the consented 38kV substation in...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision 20 Feb 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 20 Feb 2026. / Confidence: Low
Decision CONDITIONAL

Decision date 20 Feb 2026.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

for several minor amendments to the previously consented development under Planning Reference 2361049. The amendments comprise the following; re alignment of the main entrance and access gate; re alignment and widening of internal access tracks; alteration of the boundary fence; removal of the consented 38kV substation in Field 22; combined central inverters and MV transformers are replaced by separate string inverters and central MV transformers; reduction in the size of related hardstanding areas; updated table...

Ref 2561903 Source-linked Official application description for exact planning reference 2561903

Public source roles

Ballydonagh Solar Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Galway County Council
Exact reference
2561903
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Infrastructure

Infrastructure

The public application record identifies infrastructure in the submitted planning scope.

2561903Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Ballydonagh Solar Ltd
Planning agent
Care of Neo Environmental
Agent address
83-85 Bridge Street Ballymena, Co. Antrim Northern Ireland, BT44 0RL
Official description

Application text

for several minor amendments to the previously consented development under Planning Reference 2361049. The amendments comprise the following; re alignment of the main entrance and access gate; re alignment and widening of internal access tracks; alteration of the boundary fence; removal of the consented 38kV substation in Field 22; combined central inverters and MV transformers are replaced by separate string inverters and central MV transformers; reduction in the size of related hardstanding areas; updated table layout including a reduction in PV table numbers from 3209 to 3120; reduction of the of new overhead line separation areas arising from the removal of a section of the 110 kV overhead line; inclusion of an additional badger sett buffer and amendment of condition 3a to extend the operational lifetime of the solar farm from 35 years to 40 years. An updated Natura Impact Statement has been submitted with this application. A separate application to obtain permission for a 110kV grid connection and 110kV substation to facilitate the export of power from the solar farm, will be submitted to An Coimisiún Pleanála. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2561903

for several minor amendments to the previously consented development under Planning Reference 2361049. The amendments comprise the following; re alignment of the main entrance and access gate; re alignment and widening of internal access tracks; alteration of the boundary fence; removal of the consented 38kV substation in Field 22; combined central inverters and MV transformers are replaced by separate string inverters and central MV transformers; reduction in the size of related hardstanding areas; updated table layout including a reduction in PV table numbers from 3209 to 3120; reduction of the of new overhead line separation areas arising from the removal of a section of the 110 kV overhead line; inclusion of an additional badger sett buffer and amendment of condition 3a to extend the operational lifetime of the solar farm from 35 years to 40 years. An updated Natura Impact Statement has been submitted with this application. A separate application to obtain permission for a 110kV grid connection and 110kV substation to facilitate the export of power from the solar farm, will be submitted to An Coimisiún Pleanála. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

AuthorityGalway County Council
Reference2561903
StatusChecked 2 Jun 2026
Open official record