Cloonascragh, Tuam, Co. Galway

Granted 14 Jul 2026

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 24 Sep 2026. The details below are as they were then. The council's register has the current status.

What and where

Amendments to the transformer compound development permitted under…

for amendments to the transformer compound development permitted under Galway County Council Planning Register Reference 25/60096 as follows: Modifications to the consented transformer compound palisade fence to include a single pedestrian access gate; construction of an interface (marshalling) kiosk and plinth located at the boundary between the transformer compound and the existing Cloon 110kV substation (interface kiosk to be enclosed by 2.6m tall palisade fence including a gate); construction of approx. 15m (length) of 1.5m wide walkway comprising of crushed limestone on geotextile, to connect Cloon substation fenced enclosure with the interface (marshalling) kiosk fenced enclosure; approx. 50m of 110kV underground electrical cable connecting the transformer compound to the existing Cloon Substation; construction of 6.5m high x 13m long fire wall within compound and; all associated site development, drainage, access and reinstatement works. A Natura Impact Statement will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Location
Tuam, Co. Galway Map
Planning reference
2660805
Applicant
Tuam Energy Park Ltd
Agent
Conor Foy

Key facts

Project type
Energy
Received
21 May 2026
Granted
14 Jul 2026

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 14 Jul 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660805 on eplanning.ie: drawings, reports and the decision.Open the council's file

Reviewed build intelligence

What the documents establish

Government document review

Final amendment grant dated 25 August 2026; new interface works remain distinct from parent permission 25/60096 and indicative submitted design details.

4 official documents inspected · Checked 2026-09-06 · Official file index

The August grant is limited to an existing transformer-compound amendment

Recorded in final amendment grant · Current amendment 26/60805 versus the earlier compound permission 25/60096

What the evidence says
The final grant dated 25 August 2026 relates solely to amendments to permission 25/60096. The described additions include an interface marshalling kiosk, approximately 50 m of 110 kV underground cable, a roughly 15 m by 1.5 m walkway and a 6.5 m high by 13 m long fire wall. Condition 1 keeps the earlier permission and effective period in force except where expressly amended. This is not a second complete transformer compound.

Why it may matter — interpretation
Grid and civil teams can isolate the additional interface works from the already permitted compound.

What is not established
Construction, energisation, the earlier permission’s full conditions and any subsequent compliance designs are unverified.

Inspect the evidence

Cloon transformer compound: final amendment grant · p.1
25 AUG 2026 · Issued 2026-08-25 · Final grant; 12 conditions; earlier 25/60096 remains the parent permission · Checked 2026-09-06

25 AUG 2026

Cloon transformer compound: final amendment grant · p.2
relates solely to amendments · Issued 2026-08-25 · Final grant; 12 conditions; earlier 25/60096 remains the parent permission · Checked 2026-09-06

relates solely to amendments

The typical 110 kV trench uses separate power and communications ducts

Final amendment grant; submitted design detail remains indicative · Typical indicative trench detail received 21 May 2026; not a selected cable or installed route

What the evidence says
Drawing CLO001 TRACOM 003 shows three power ducts labelled 160 mm outer-diameter HDPE, SDR 17.6, and separate communications ducts labelled 125 mm. It calls for CBGM B bedding, compacted Clause 804 backfill, marker strips and pull ropes. Its note leaves precise specification to ESB/EirGrid. The earth-continuity duct label contains an apparent unit typo and is not silently corrected into a specification here.

Why it may matter — interpretation
Cable designers and duct suppliers can identify the proposed duct classes and the network-owner detail still to be confirmed.

What is not established
Final network-owner detail, cable conductor/rating, duct supplier and installed route are unverified.

Inspect the evidence

Typical 110 kV ducting in transformer compound · p.1
HDPE ESB Approved Duct · Issued 2026-05-11 · Rev B; CLO001 TRACOM 003 Elevation; received 21 May 2026; indicative network-owner detail · Checked 2026-09-06

HDPE ESB Approved Duct

The submitted control-room section identifies cavity insulation

Final amendment grant; submitted design detail remains indicative · Submitted control-building context within an amendment to the previously permitted compound

What the evidence says
The control-building drawing shows 100 mm outer blockwork, a 125 mm cavity with 80 mm Kooltherm K108 or similar approved, and a 215 mm inner leaf. Its note says elevations and dimensions are indicative and precise details remain to be determined. This attached compound drawing provides material context; the amendment’s scope does not establish a newly added control building.

Why it may matter — interpretation
Envelope designers and insulation suppliers can compare the named option with later approved assemblies.

What is not established
Final insulation selection, wall performance, procurement and whether this assembly has been built are unverified.

Inspect the evidence

Cloon control-room elevations and section · p.1
Kooltherm K108 · Issued 2026-05-11 · Rev B; CLO001 TRACOM 002 Elevation; planning drawing, received 21 May 2026 · Checked 2026-09-06

Kooltherm K108

The floor section names insulation and a radon membrane

Final amendment grant; submitted design detail remains indicative · Indicative control-room section; no added building quantity inferred

What the evidence says
The same section shows a 150 mm reinforced-concrete subfloor over 50 mm Kingspan Kooltherm K3, a Monarflex RMB 350 radon barrier/DPM, blinding and compacted hardcore. It also shows a 200 mm hollowcore ceiling with a 50 mm structural screed. These are indicative submitted compound details and do not establish a new control-building package under this amendment.

Why it may matter — interpretation
Structural and waterproofing designers can check the proposed floor build-up and membrane interface against final details.

What is not established
Selected reinforcement design, membrane system, floor performance and installed assembly are unverified.

Inspect the evidence

Cloon control-room elevations and section · p.1
Monarflex RMB 350 · Issued 2026-05-11 · Rev B; CLO001 TRACOM 002 Elevation; planning drawing, received 21 May 2026 · Checked 2026-09-06

Monarflex RMB 350

The walkway and vehicle track have distinct crushed-stone sections

Final amendment grant; submitted design detail remains indicative · Indicative track and walkway details for the compound interfaces

What the evidence says
The typical detail shows a 1.5 m walkway with minimum 150 mm crushed stone over minimum 150 mm compacted subgrade, and a separate 4 m track with minimum 100 mm crushed stone over minimum 150 mm compacted subgrade. Drainage swales are shown beside both. These typical widths are not multiplied into an unverified total surfacing quantity.

Why it may matter — interpretation
Civil designers and aggregate suppliers can distinguish pedestrian and vehicle build-ups before preparing quantities.

What is not established
Final lengths, pavement calculations, aggregate selection and installed areas are unverified.

Inspect the evidence

Typical access track and walkway detail · p.1
Minimum 150mm Crushed Stone · Issued 2026-05-11 · Rev B; CLO001 TRACOM 006 Elevation; received 21 May 2026; indicative dimensions · Checked 2026-09-06

Minimum 150mm Crushed Stone

An external-lighting plan still needs separate agreement

Recorded in final amendment grant · Pre-commencement condition in the final amendment permission

What the evidence says
Condition 7 of the final amendment grant requires an external-lighting plan for written agreement before commencement. This decision does not establish the luminaire count, selected product, colour temperature or installed lighting.

Why it may matter — interpretation
Lighting designers can identify the missing approved scheme before specifying fittings or assessing spill.

What is not established
The agreed later lighting plan and installed equipment have not been inspected.

Inspect the evidence

Cloon transformer compound: final amendment grant · p.3
external lighting plan · Issued 2026-08-25 · Final grant; 12 conditions; earlier 25/60096 remains the parent permission · Checked 2026-09-06

external lighting plan
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 4 government-published PDFs were visually inspected. The exact official index has 38 file links. Four PDFs were retrieved and selected relevant pages visually inspected; remaining correspondence and the wider NIS were not reviewed. Proposals do not establish procurement or installed work.

How we know this

From the Galway County Council planning register, as last seen on 24 Sep 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Tuam

Get alerts for TuamFree. We email you when new applications appear.

Free email alerts

Get new Tuam projects by email

New planning applications, decisions and site starts in Tuam, Co. Galway. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options