Back to leads
Commencement

98 dwellings, Kildare, Kildare - Planning Application 181028

Kildare / Kildare / Kildare, Kildare

Est. value €10m–30m
Units 98
Floor area 10,613 m²
Commenced 20 Dec 2024

Source-linked planning record

98 dwellings, Kildare, Kildare - Planning Application 181028

Kildare / Kildare / Kildare, Kildare
PB ref
PB-454632
Plan ref
181028
Authority
Kildare County Council
Stage / date
Commencement / 20 Dec 2024
Est. value band
€10m–30m
Units / floor
98 / 10,613 m²
Project class
Large residential
Promoter
not available yet
Architect / agent
not available yet

Source: http://www.eplanning.ie/KildareCC/AppFileRefDetails/181028/0

Key facts

Lead summary

Source
Owner-supplied commencement export
Planning authority
Kildare County Council
Application reference
181028
Applicant
not available yet
Agent
not available yet
Decision stage
Commencement
Commenced
20 Dec 2024
Units
98
Floor area
10,613 m²

Official description

Verbatim source text

The proposed development comprises a residential scheme of 96 no. dwelling units in a mixture of 2 storey and 2 storey plus dormer houses and a 3-storey duplex apartment building (GFA approx. 11,854.4 m²); and provision of a single/two storey childcare facility (GFA approx. 392 m²), including outdoor amenity space, 24 no. car parking spaces, a bike shelter accommodating 10 no. bicycle parking spaces, and a bin store (13 m²). The 83 no proposed houses shall comprise of 63 no. 2-storey 3-bedroom houses, and 20 no. 2.5 storey 4-bedroom houses; 166 no. car parking spaces provided on-curtilage. The 13 no. proposed apartments, accommodated in 1 no. 3-storey duplex apartment building, shall comprise of: 1 no. 1-bedroom unit, 6 no. 2-bedroom units, and 6 no. 3-bedroom units; together with 23 no. allocated and visitor car parking spaces, 1 no bin store, and 2 no. bike shelters accommodating 20 no. bicycle parking spaces. The proposed development also comprises all ancillary site development works, landscaping and boundary treatment, including: 2 no. pedestrian/cyclist access points of Dunmurray Road, a pedestrian/cyclist access points off the proposed Southern Internal Link, and a pedestrian/cyclist access point off Old Road (4 no. pedestrian/cyclist entrances in total); public open space (approx. 1.38 ha); 2 no. vehicular access points to serve the development are provided off Dunmurray Road (opposite Bishopsland) and the proposed Southern Internal Link Road (between Old Road and Dunmurray Road), and undergrounding of existing electrical services. The development shall also include the provision of the Southern Internal Link Road between Southgreen Road and Dunmurray Road, including junction upgrade works at Southgreen Road, Old Road and Dunmurray Road; provision of improvement works to Dunmurray Road from a point approx. 54m north of the junction with Dunmurray Court to a point approx. 95m north of the junction with Crockanure Avenue, to provide a pedestrian path and off-carriageway cycle path on western side of the road. REVISED BY FURTHER SIGNIFICANT INFORMATION CONSISTING OF

Verify against official source

Project team

Named source parties

Promoter
not available yet
Planning agent
not available yet

Lifecycle timeline

Application to site progress

  1. Applied

    20 Dec 2024 181028
  2. Decision

    Commencement notice filed 4 Sep 2019
  3. Appeal

    No appeal indexed No public appeal record is indexed against this application.
  4. Commenced

    20 Dec 2024 CN0123848KE
  5. Completed

    Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.

Likely trades & supplier leads

Inferred from scheme type and scale

Childcare fit-outElectricalFire SafetyGroundworksHealth & SafetyLandscapingLift contractorMain contractorMechanicalRoads/CivilsWindows/Doors
Board this lead Create alert