Site start · Co. Kildare
An Droichead Nua, Kildare
Site start 19 Sep 2024
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 10 Jun 2026. The details below are as they were then. The council's register has the current status.
What and where
~12 homes
for to construct (1) a new two storey apartment building, consisting of 2 no. 1-bedroom apartments, 4 no. 2-bedroom apartments, 6 units in total with a gross development area of 411 m², (2) 6 no. car parking spaces, (3) all necessary connections in respect of services, (4) secure bicycle parking and bin storage, (5) associated landscaping, & (6) miscellaneous minor siteworks and boundary treatments to facilitate the integration with the completed phase 1 of the permitted scheme under An Bord Pleanála ref. No. 305244-19. The proposed seeks to replace the 1 No. three bedroom, one & a half storey detached dormer bungalow, which was previously granted as a larger 12 No. house scheme under An Bord Pleanála ref. No. 305244-19.
- Location
- An Droichead Nua, Co. Kildare Map
- Council
- Kildare County Council
- Planning reference
- 2360328
- Applicant
- Sayvale 23 Ltd
- Agent
- Jem Construction
- Builder
- Jem Construction
Key facts
- Homes
- ~12estimated from the application
- Floor area
- 411 m²per planning documents
- Project type
- Small multi-unit
- Site start
- 19 Sep 2024
Documents and evidence
Check the record
- Council planning fileThe application file 2360328 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Application Form - Part A in the council's file.
- Unit mix
- 2 1-bed apartment, 4 2-bed apartment
- Floor area
- 411 m² (per planning documents)
- Site area
- 0.077 ha
- Applicant
- Sayvale 23 Ltd
- Phasing
- Phase 2 replacing a previously permitted dormer bungalow, integrating with completed phase 1 of scheme under ABP ref.
- Scope
- Construction of a two-storey apartment building with 6 units, car parking, bicycle parking, bin storage, landscaping, and siteworks to replace a previously permitted dormer bungalow as part of a phased development.
- Roofing
- “Cembrit Berona Xxtra Slates (110mm Head Lap) Colour = Slate Graphite”
- Cladding
- “Standing Seam Metal Cladding”
- Windows/doors
- “uPVC double glazed window/door - RAL 7016”
- Windows/doors
- “Concrete window sill”
- Cladding
- “Self-coloured render in light colour”
How we know this
From the Kildare County Council planning register, as last seen on 10 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Commencement notices for this permission
- 19 Sep 2024Work started · Construction of a new two storey apartment building, consisting of 2 no. 1-bedroom...
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area