Energy · Co. Limerick

Raheen Business Park, Raheen, Limerick

Under appeal since 10 Aug 2026 (Decision to grant 29 Jul 2026 by the council)

Get updates on this application

We'll email you if the decision is appealed and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2660490 at Raheen Business Park, Raheen, Limerick: Installation of a ground mounted solar photovoltaic plant…
  • The applicant is Eli Lilly Kinsale Ltd. The agent is Elena Vazquez.
  • It was received by Limerick City and County Council on 30 Apr 2026.
  • Status: Under appeal since 10 Aug 2026 (Decision to grant 29 Jul 2026 by the council).
  • The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Source: the Limerick City and County Council planning register, checked 19 Aug 2026. Open the council's file

More planning applications in Raheen · Planning applications in Co. Limerick

What and where

Installation of a ground mounted solar photovoltaic plant…

the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 2.80 MWp and a grid connection capacity of 2.33 MW ac within a 3.48 hectare site, including the installation and the cable route to the point of connection at Raheen Business Park, Raheen, Limerick. The proposed development will include approximately 5,432 photo-voltaic modules, covering an approximate area of 18,018.70 square metres, installed on a fixed East West mounting structure with an approximate height of 0.8 metres at the lower edge and 3.1 metres at the highest point. The development will also comprise underground direct current and alternating current cabling, including a cable route located beneath the existing internal cycle path within Raheen Business Park, string combiner boxes, inverters, a prefabricated low voltage transformer cabin located within the photovoltaic installation area, earthing and grid synchronisation equipment, perimeter security fencing with wildlife access points, CCTV where required, drainage and all associated civil works. The development will also include a temporary construction compound and set down area, together with the installation of a mobile welfare unit during the construction phase. The grid connection will be made via the existing on site substation within Raheen Business Park. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Description as published by the council. Its text starts part-way through a sentence.

Location
Raheen, Co. Limerick Map
Planning reference
2660490

Numbers and dates

Floor area
18,019 m²
Project type
Energy
Received
30 Apr 2026
Council decision
29 Jul 2026
Appeal lodged
10 Aug 2026

Timeline

  1. Application received
  2. Decision to grant by the council
  3. Appeal lodged

Outlook

What happens next

The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Work packages named so far

  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the Limerick City and County Council planning register, checked 19 Aug 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Raheen

Get alerts for RaheenFree. We email you when new applications appear.

Free email alerts

Get new Raheen projects by email

New applications, decisions and site starts in Raheen, Co. Limerick. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options