Infrastructure, Annacotty Weir on the River Mulkear, Townlands of Garraunykee...
I. The full removal (34m) of the Annacotty Weir and fish passage from the eastern riverbank up to the adjacent mill race and sluice gate at the western riverbank and making good the face of retained structural elements. II. The reprofiling and restoration of approximately 50m of the river channel to reinstate natural stream...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
No near-term procurement timing is inferred from a refused planning decision.
REFUSED / Confidence: High for planning stateDecision recorded 8 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
I. The full removal (34m) of the Annacotty Weir and fish passage from the eastern riverbank up to the adjacent mill race and sluice gate at the western riverbank and making good the face of retained structural elements. II. The reprofiling and restoration of approximately 50m of the river channel to reinstate natural stream conditions and enable fish migration. This includes placement of boulders, and graded rock to replicate healthy, stable, and natural channel conditions. III. Temporary site access for...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Confidence & provenance 1 official source
- Authority
- Limerick City and County Council
- Exact reference
- 2660806
- Evidence reviewed
- 25 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Inland Fisheries Ireland
- Planning agent
- Luke Grainger
- Agent address
- O'Connor Sutton Cronin 9 Prussia Street Dublin 7 D07KT57
More Limerick planning activity
These are county discovery links, not claimed relationships to this application.
Application text
I. The full removal (34m) of the Annacotty Weir and fish passage from the eastern riverbank up to the adjacent mill race and sluice gate at the western riverbank and making good the face of retained structural elements. II. The reprofiling and restoration of approximately 50m of the river channel to reinstate natural stream conditions and enable fish migration. This includes placement of boulders, and graded rock to replicate healthy, stable, and natural channel conditions. III. Temporary site access for construction stage is proposed from the Woodstown Road via the existing gateway adjacent to the junction with Mountshannon Road and existing pathway. Creation of a temporary access ramp from the eastern riverbank and temporary stone causeway (with pipes for river flow) on the downstream side of the weir to allow construction vehicle access to the weir from the eastern riverbank; the stone causeway and ramp will be removed as removal of the weir structure progresses. The removal of individual trees to enable construction activities. The creation of temporary construction lay down areas/site compounds on lands approximately 50m to the east of the existing weir. IV. Reinstatement of the disturbed lands following weir removal including landscaping consisting of seeding and planting with appropriate native vegetation, removal of temporary construction facilities, and riverbank restoration works. V. All associated and ancillary site development works. VI. The planning application, including the Natura Impact Statement
Application to site progress
-
Applied 15 Jul 2026 2660806
-
Decision Refused 8 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed This planning record has no linked public commencement evidence.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660806
I. The full removal (34m) of the Annacotty Weir and fish passage from the eastern riverbank up to the adjacent mill race and sluice gate at the western riverbank and making good the face of retained structural elements. II. The reprofiling and restoration of approximately 50m of the river channel to reinstate natural stream conditions and enable fish migration. This includes placement of boulders, and graded rock to replicate healthy, stable, and natural channel conditions. III. Temporary site access for construction stage is proposed from the Woodstown Road via the existing gateway adjacent to the junction with Mountshannon Road and existing pathway. Creation of a temporary access ramp from the eastern riverbank and temporary stone causeway (with pipes for river flow) on the downstream side of the weir to allow construction vehicle access to the weir from the eastern riverbank; the stone causeway and ramp will be removed as removal of the weir structure progresses. The removal of individual trees to enable construction activities. The creation of temporary construction lay down areas/site compounds on lands approximately 50m to the east of the existing weir. IV. Reinstatement of the disturbed lands following weir removal including landscaping consisting of seeding and planting with appropriate native vegetation, removal of temporary construction facilities, and riverbank restoration works. V. All associated and ancillary site development works. VI. The planning application, including the Natura Impact Statement
Open official record